The purpose of this study was to assess the effect of implementation of a critical pathway after simultaneous pancreas-kidney transplantation on length of stay and hospital charges. Two well-matched groups were compared: 10 patients who received transplants in 1991 (before implementation of the critical pathway) and 10 patients who received transplants in 1995 (after implementation). For the initial transplant hospitalization, the critical pathway was associated with significant reductions in length of stay, total number of laboratory tests, clinical laboratory charges, and total inpatient charges with organ acquisition charges excluded. Despite the rising costs of medical care, we have designed and implemented a critical pathway for simultaneous pancreas-kidney transplantation that has stabilized hospital charges by decreasing length of stay and the number of clinical laboratory tests.

Download full-text PDF

Source
http://dx.doi.org/10.7182/prtr.1.7.4.85t3h0px60466773DOI Listing

Publication Analysis

Top Keywords

critical pathway
20
implementation critical
12
pathway simultaneous
12
simultaneous pancreas-kidney
12
length stay
12
pancreas-kidney transplantation
8
hospital charges
8
patients received
8
received transplants
8
laboratory tests
8

Similar Publications

Background: Tuberous sclerosis complex (TSC) is an autosomal dominant genetic disorder affecting multiple organ systems, with a prevalence of 1:6,760-1:13,520 live births in Germany. On the molecular level, TSC is caused by heterozygous loss-of-function variants in either of the genes TSC1 or TSC2, encoding the Tuberin-Hamartin complex, which acts as a critical upstream suppressor of the mammalian target of rapamycin (mTOR), a key signaling pathway controlling cellular growth and metabolism. Despite the therapeutic success of mTOR inhibition in treating TSC-associated manifestations, studies with mTOR inhibitors in children with TSC above two years of age have failed to demonstrate beneficial effects on disease-related neuropsychological deficits.

View Article and Find Full Text PDF

Background: Children's social-emotional development and mental well-being are critical to adult mental health. However, little is known about the mechanisms or factors that contribute to poor child mental health in low- and middle-income countries. Given the lack of child mental health research to guide interventions or social-emotional learning programs and policy planning, the present study aimed to address these knowledge gaps by examining the psychopathology mechanism involved in the development of childhood mental health problems.

View Article and Find Full Text PDF

The mechanism of Hespintor (a protein of serpin family) inhibitory action on the growth of inoculated hepatocellular carcinoma was studied in a model of human hepatoma in nude mice by using on long-noncoding RNA (lncRNA) sequencing. Two days after tumor transplantation, Hespintor or normal saline was injected into the caudal vein at a dose of 15 μg/kg (2 times a week over 4 weeks). The tumors were isolated in 4 weeks after subcutaneous injection of human hepatoma MHCC97-H cells.

View Article and Find Full Text PDF

Gene‒gene interactions play pivotal roles in disease pathogenesis and are fundamental in the development of targeted therapeutics, particularly through the elucidation of oncogenic gene drivers in cancer. The systematic analysis of pathways and gene interactions is critical in the drug discovery process for various cancer subtypes. SPAG5, known for its role in spindle formation during cell division, has been identified as an oncogene in several cancers, although its specific impact on AML remains underexplored.

View Article and Find Full Text PDF

Background: The pathogenesis of acute kidney injury (AKI) is not fully understood. Tax1-binding protein 1 (TAX1BP1) modulates inflammation and apoptosis through the NF-kB signaling pathway, however, its specific role in ischemic AKI remains unclear.

Methods: We injected a TAX1BP1 overexpression plasmid into the tail vein of male C57BL/6 mice, followed by clamping the bilateral renal arteries to induce AKI.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!