Interruptions and downtime of continuous renal replacement therapy in critically ill adults: A retrospective observational study.

Nurs Crit Care

Department of Intensive Care Unit, Nanjing Drum Tower Hospital, Affiliated Hospital of Medical School, Nanjing University, Nanjing, China.

Published: March 2025

Background: The effective treatment time of continuous renal replacement therapy (CRRT) is significantly important. Downtime caused by interruptions is still unclear during a circuit filter.

Aim: This study aimed to analyse the interruptions and downtime during a circuit filter through the data recorded by the internal data storage cards of the CRRT machine.

Methods: This is a single-centre retrospective observational study. From August 2019 to April 2020, all patients who received CRRT treatment with the Prismaflex device (Gambro, America) were enrolled.  After downloading the data from the internal data storage cards, it was meticulously sorted and verified using Excel. Statistical analyses were performed using SPSS software (version 22.0).

Results: A total of 143 CRRT circuits in 59 patients were analysed. The overall median circuit life was 39.22 (IQR, 24.07-60.25) h, median amount of interruption was 67 (IQR, 42-100), causing a median downtime of 1.98 (IQR, 1.20-2.85) h and a median downtime proportion (ratio of downtime/circuit life) of 4.58% (IQR, 3.50-6.69). Circuit downtime was mainly caused by bag change (1.17 ± 0.66 h [p < 0.001]). Circuits in the group of downtime proportion >10% had longer downtime (2.53 ± 3.37 h, p < 0.001) and more circuit alarms (45.54 ± 42.87, p < 0.001), and alarms cost much more time to be fixed (1.03 [IQR, 0.42-2.24] h, p < 0.001). No variation was found in downtime among groups according to circuit lifespan.

Conclusions: Interruptions in a circuit can accumulate into non-negligible downtime. Specialized nursing actions through education and training are of great significance to avoid unnecessary interruptions.

Relevance To Clinical Practice: Nurses' behaviour is related to the downtime of CRRT. Intensive care unit (ICU) nurses should be trained to inculcate the behaviours, including keeping sufficient bags at patient's bedside, changing solution bags actively, adressing alarms swiftly, arranging the examinations and the initiation of a CRRT reasonably.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11871508PMC
http://dx.doi.org/10.1111/nicc.13265DOI Listing

Publication Analysis

Top Keywords

interruptions downtime
8
continuous renal
8
renal replacement
8
replacement therapy
8
retrospective observational
8
observational study
8
downtime caused
8
internal data
8
data storage
8
storage cards
8

Similar Publications

Interruptions and downtime of continuous renal replacement therapy in critically ill adults: A retrospective observational study.

Nurs Crit Care

March 2025

Department of Intensive Care Unit, Nanjing Drum Tower Hospital, Affiliated Hospital of Medical School, Nanjing University, Nanjing, China.

Background: The effective treatment time of continuous renal replacement therapy (CRRT) is significantly important. Downtime caused by interruptions is still unclear during a circuit filter.

Aim: This study aimed to analyse the interruptions and downtime during a circuit filter through the data recorded by the internal data storage cards of the CRRT machine.

View Article and Find Full Text PDF

Introduction: This paper describes a method to improve gantry-dependent beam steering for Elekta traveling wave linear accelerators by applying the measured and filtered beam servo corrections to the existing lookup table (LUT). Beam steering has a direct influence on the treatment accuracy by affecting the beam symmetry and position. The presented method provides an improved LUT with respect to the default Elekta method to reduce treatment delivery interruptions.

View Article and Find Full Text PDF

Equipment downtime resulting from maintenance in various sectors around the globe has become a major concern. The effectiveness of conventional reactive maintenance methods in addressing interruptions and enhancing operational efficiency has become inadequate. Therefore, acknowledging the constraints associated with reactive maintenance and the growing need for proactive approaches to proactively detect possible breakdowns is necessary.

View Article and Find Full Text PDF

Benchmark for welding gun fault prediction with multivariate time series data.

Sci Data

January 2024

BMW Brilliance Automotive Ltd., Shenyang, 110143, P. R. China.

In the automotive industry, machinery failures of the resistance spot welding (RSW) guns would interrupt the manufacturing lines and cause unplanned downtime, potentially resulting in a significant loss of production and reliability. Predicting the machinery failures of the RSW gun can provide more scientific strategies for predictive maintenance and decision-making. However, fault prediction of RSW guns has become increasingly challenging due to their complex behavior and data variability.

View Article and Find Full Text PDF

Chest compression quality and patient outcomes with the use of a CPR feedback device: A retrospective study.

Sci Rep

November 2023

Department of Intensive Care Medicine, Sengkang General Hospital, 110 Sengkang East Way, Singapore, 544886, Singapore.

Feedback devices were developed to guide resuscitations as targets recommended by various guidelines are difficult to achieve. Yet, there is limited evidence to support their use for in-hospital cardiac arrests (IHCA), and they did not correlate with patient outcomes. Therefore, this study has investigated the compression quality and patient outcomes in IHCA with the use of a feedback device via a retrospective study of inpatient code blue activations in a Singapore hospital over one year.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!