Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Delays in accessing chest drain equipment in the Emergency Department (ED) posed significant risks to patient safety, particularly for those with life-threatening pneumothorax. This quality improvement project (QIP) aimed to reduce these delays by implementing a dedicated chest drain trolley using the Plan-Do-Study-Act (PDSA) methodology. Surveys and simulations identified key issues, including equipment inaccessibility and staff unfamiliarity, with baseline preparation times exceeding 20 minutes. Iterative changes, such as labeling drawers, reorganizing supplies, and creating checklists, reduced preparation times to 6-7 minutes. Real-case feedback highlighted improved efficiency, staff confidence, and patient safety. This project demonstrates the value of structured quality improvement approaches in enhancing emergency care.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11681970 | PMC |
http://dx.doi.org/10.7759/cureus.76489 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!