A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Insight into shortening mechanisms of start-up time for three-dimensional biofilm electrode reactor/pyrite-autotrophic denitrification coupled system. | LitMetric

AI Article Synopsis

  • A three-dimensional biofilm electrode reactor (3D-BER) combined with pyrite-autotrophic denitrification (PAD) was developed to explore how electrical current affects the system's start-up period and efficiency.
  • Results indicated that higher current levels shorten start-up time and enhance nitrate removal efficiency, reaching about 88.2% after 13 days at 20 mA.
  • The study also found that optimal current levels (10 or 20 mA) supported the growth of beneficial denitrifying bacteria and boosted the expression of related functional genes, contributing to a better understanding of the system's denitrification mechanisms.

Article Abstract

In this study, a three-dimensional biofilm electrode reactor (3D-BER)/pyrite-autotrophic denitrification (PAD) coupled (3D-BER-PAD) system was constructed, aiming at investigating the effect of current on the start-up period of the system. The results showed that increasing current could shorten the system's start-up period and improve nitrate removal efficiency (NRE). When the current was 20 mA, the system could start stabilization after approximately 13 days and maintain a stable NRE (88.2 ± 3.4 %) with low energy consumption (0.05 ± 0.003 kW·h/gNO-N). Additionally, an appropriate current (10 or 20 mA) promoted the reproduction of denitrifying bacteria (e.g., Thiobacillus and Thermomonas) and the expression of functional genes involved in denitrification and sulfur oxidation. Finally, the denitrification mechanism and electron transfer model in the 3D-BER-PAD system were proposed. This study has reference value for the rapid start-up and the improvement of treatment efficiency in the 3D-BER-PAD system.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.biortech.2024.131719DOI Listing

Publication Analysis

Top Keywords

3d-ber-pad system
12
three-dimensional biofilm
8
biofilm electrode
8
start-up period
8
system
6
insight shortening
4
shortening mechanisms
4
start-up
4
mechanisms start-up
4
start-up time
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!