Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Background: The adipose-derived stromal vascular fraction (SVF) plays a crucial role in regenerative medicine owing to its regenerative and immunomodulatory properties. However, the effective utilization of SVF in therapeutic applications requires careful consideration of storage conditions to maintain cell viability.
Methods: We conducted a research on 43 patients of different ages and sexes who were older than 18 years. This study explored the impact of different temperatures (-80, -20, and 4 °C) on SVF storage in platelet-poor plasma for 1 and 6 months. SVF extracted using a semi-UNISTATION™ system was subjected to rigorous analysis of cell count and viability using a LUNA-STEM™ Dual Fluorescence Cell Counter.
Results: The results indicated a significant correlation between the storage conditions and SVF viability. Notably, storing SVF at 4 °C demonstrated the highest cell viability and count, while -80 °C storage exhibited the least favorable outcomes. This study emphasizes the importance of minimizing storage time to preserve SVF viability, as evidenced by a decline in both cell count and viability over a 6-month period. Comparisons with the existing literature underscore the need for precise protocols for SVF storage, with considerations for temperature and cryoprotective agents. These findings provide valuable insights for developing optimal SVF storage protocols to enhance therapeutic outcomes and reduce the need for repeated adipose tissue harvesting. Despite the limitations of the study, such as the use of a cell counter instead of flow cytometry, the results establish the foundation for further research on refining SVF storage methods.
Conclusion: The ideal storage temperature is from 4 °C, while the length of storage time inversely affects the viability of SVF; the longer the storage time, the lower the number and the viability of SVF cells, regardless of the temperature at which they are preserved.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11419534 | PMC |
http://dx.doi.org/10.1097/MD.0000000000039859 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!