Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The rising global demand for high-purity nickel (Ni) sulphate, primarily used in lithium-ion batteries, is largely met by processing Indonesian laterite ores via hydrometallurgy. However, this supply chain is associated with significant environmental challenges and lack of transparent industrial data. This study uses a cradle-to-gate life cycle assessment (LCA) approach to quantify the greenhouse gas (GHG) emissions and energy use associated with the production of mixed hydroxide precipitate (MHP) from low-grade Indonesian laterites via high-pressure acid leaching (HPAL), which is then refined in China for the production of battery-grade nickel sulphate hexahydrate (NiSO·6HO, NSH). Fifteen impact categories are analyzed using established impact assessment and allocation (mass and economic) methods. The analysis reveals that feed preparation/HPAL and purification are the stages that contribute most to environmental impacts and in particular to global warming potential (GWP). Mass allocation results in higher environmental impacts, with 36.8 kg CO-eq per 1 kg of Ni in NSH for GWP, compared to 33.8 kg CO-eq per 1 kg of Ni in NSH when economic allocation is used. Sensitivity analysis shows a potential reduction (up to 13 %) in key impact categories if production of NSH is fully integrated in Indonesia or a greener electricity mix is used. Overall, our results indicate that the production of MHP in Indonesia and its refinement to NSH in China has a GWP about two times higher than the global average. Given the limited number of LCA studies for the production of battery-grade nickel, this study highlights major environmental concerns for the NSH production process from Indonesian laterites and identifies opportunities for improvement, towards a more sustainable global battery supply chain.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1016/j.scitotenv.2024.175902 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!