An innovative circular economy (CE) system was implemented at the wastewater treatment plant (WWTP) in Brunswick. The performance of the CE system was evaluated for 4 years: the thermal pressure hydrolysis enhanced the methane production by 18% and increased the digestate dewaterability by 14%. Refractory COD formed in thermal hydrolysis and increased the COD concentration in the WWTP effluent by 4 mg L while still complying with the legal threshold. Struvite production reached high phosphorus recovery rates of >80% with a Mg:P molar ratio ≥0.8. Nitrogen was successfully recovered as ammonium sulfate with high recovery rates of 85-97%. The chemical analyses of secondary fertilizers showed a low pollutant content, posing low risks to soil and groundwater ecosystems. The total carbon footprint of the WWTP decreased due to enhanced biogas production, the recovery of renewable fertilizers and a further reduction of nitrous oxide emissions. Using green energy will be crucial to reach carbon neutrality for the entire WWTP.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.2166/wst.2024.247 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!