A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Unleashing the Power of Reliance for Post-Approval Changes: A Journey with 48 National Regulatory Authorities. | LitMetric

Post-approval changes (PACs) to marketed products are routinely introduced to continuously enhance the product lifecycle management. However, bringing a chemistry, manufacturing and control (CMC) change through the global health authorities can be a complex and lengthy process taking up to several years, therefore negatively impacting supply continuity. In order to accelerate the review and approval of regulatory submissions and ensure continuous supply to patients, the World Health Organization (WHO) is strongly supporting the implementation of reliance among National Regulatory Authorities (NRAs). While some promising developments have been made with the use of reliance pathways for initial marketing authorizations, reliance is still not widely used for PACs. With the support of the European Medicines Agency (EMA) and WHO, Roche launched a reliance pilot based on EMA approval to file a supply critical variation for a monoclonal antibody. The variation constitutes major changes to the approved manufacturing process. Sameness of the product is ensured by submitting to all participants the same variation package as in the EU. The objectives of the pilot are to ensure continuous supply of this critical medicine by targeting global approval in 6.5 months, to promote regulatory convergence by waiving country specific requirements, and enhance greater transparency by sharing EMA Committee for Medicinal Products for Human Use (CHMP) final assessment report and Q&As to participating NRAs. Globally 48 NRAs have agreed to join the pilot. This article outlines the process of establishing the pilot project, including a planning phase and an engagement phase with the EMA, WHO and the participating NRAs.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11530517PMC
http://dx.doi.org/10.1007/s43441-024-00677-8DOI Listing

Publication Analysis

Top Keywords

post-approval changes
8
national regulatory
8
regulatory authorities
8
ensure continuous
8
continuous supply
8
supply critical
8
participating nras
8
reliance
5
unleashing power
4
power reliance
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!