A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3145
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Repair of Underwater Concrete Cracks on Dam Surface: Optimization Analysis of the Grouting Process with Surface Sealing. | LitMetric

The grouting repair process of the sealing baffle on the surface of dam cracks can improve the repair slurry diffusion distance in the cracks; however, the process must be optimized. To address the problem of crack repair technology of underwater dam concrete with one section open and the other closed, a grouting analysis model was established. By adjusting various parameters in the grouting process, the influences of the grouting pressure, position of the grouting hole, diameter of the grouting hole, and water pressure on the diffusion of the Bingham fluid repair slurry in these cracks were studied. The results show that the grouting pressure and diameter of the grouting hole significantly influence the limited diffusion distance of Bingham fluid cement slurry in cracks. With an increase in grouting pressure and grouting hole diameter, the limiting distance of the front surface increases. The influences of the water pressure and position of the grouting hole are small. In addition, through correlation analysis, the degrees of influence of different factors can be sorted, providing the priority factors for actual operation construction.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11256329PMC
http://dx.doi.org/10.1021/acsomega.3c09662DOI Listing

Publication Analysis

Top Keywords

grouting hole
20
grouting
12
grouting pressure
12
grouting process
8
repair slurry
8
diffusion distance
8
pressure position
8
position grouting
8
hole diameter
8
diameter grouting
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!