Download full-text PDF

Source
http://dx.doi.org/10.1038/d41586-024-02247-2DOI Listing

Publication Analysis

Top Keywords

iter delay
4
delay nuclear
4
nuclear fusion
4
iter
1
nuclear
1
fusion
1

Similar Publications

Hot cathode ionization gauges will measure the neutral gas pressure in the vacuum vessel of ITER. Overall, 52 gauge heads based on the concept of the ASDEX pressure gauge but using novel ZrC emitters are located in the divertor, in equatorial ports and in pumping ducts. The initial lifetime tests of the novel gauge design have raised the concern that the pyrolytic graphite used to indirectly heat the ceramic ZrC emitter erodes too fast during operation.

View Article and Find Full Text PDF

ITER operations delayed to 2034, with energy-producing reactions expected 5 years later.

View Article and Find Full Text PDF

The COVID-19 pandemic has created an emergency across the globe. The number of corona positive and death cases is still rising worldwide. All countries' governments are taking various steps to control the infection of COVID-19.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!