Interferon regulatory factor 4 (IRF4) was initially identified as a key controller in lymphocyte differentiation and function, and subsequently as a dependency factor and therapy target in lymphocyte-derived cancers. In melanocytes, IRF4 takes part in pigmentation. Although genetic studies have implicated IRF4 in melanoma, how IRF4 functions in melanoma cells has remained largely elusive. Here, we confirmed prevalent IRF4 expression in melanoma and showed that high expression is linked to dependency in cells and mortality in patients. Analysis of genes activated by IRF4 uncovered, as a novel target category, epigenetic silencing factors involved in DNA methylation (DNMT1, DNMT3B, UHRF1) and histone H3K27 methylation (EZH2). Consequently, we show that IRF4 controls the expression of tumour suppressor genes known to be silenced by these epigenetic modifications, for instance cyclin-dependent kinase inhibitors CDKN1A and CDKN1B, the PI3-AKT pathway regulator PTEN, and primary cilium components. Furthermore, IRF4 modulates activity of key downstream oncogenic pathways, such as WNT/β-catenin and AKT, impacting cell proliferation and survival. Accordingly, IRF4 modifies the effectiveness of pertinent epigenetic drugs on melanoma cells, a finding that encourages further studies towards therapeutic targeting of IRF4 in melanoma.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11459048 | PMC |
http://dx.doi.org/10.1002/1878-0261.13672 | DOI Listing |
Therapies against hematological malignancies using chimeric antigen receptors (CAR)-T cells have shown great potential; however, therapeutic success in solid tumors has been constrained due to limited tumor trafficking and infiltration, as well as the scarcity of cancer-specific solid tumor antigens. Therefore, the enrichment of tumor-antigen specific CAR-T cells in the desired region is critical for improving therapy efficacy and reducing systemic on-target/off-tumor side effects. Here, we functionalized human CAR-T cells with superparamagnetic iron oxide nanoparticles (SPIONs), making them magnetically controllable for site-directed targeting.
View Article and Find Full Text PDFEXCLI J
November 2024
Department of Diagnostics and Cancer Immunology, Greater Poland Cancer Center, 15 Garbary Street, 61-866 Poznan, Poland.
Cutaneous melanoma is the deadliest form of skin cancer. Despite advancements in treatment, many patients still face poor outcomes. A deeper understanding of the mechanisms involved in melanoma pathogenesis is crucial for improving diagnosis and therapy.
View Article and Find Full Text PDFThousands of regulatory noncoding RNAs (ncRNAs) have been annotated; however, their functions in gene regulation and contributions to cancer formation remain poorly understood. To gain a better understanding of the influence of ncRNAs on gene regulation during melanoma progression, we mapped the landscape of ncRNAs in melanocytes and melanoma cells. Nearly half of deregulated genes in melanoma are ncRNAs, with antisense RNAs (asRNAs) comprising a large portion of deregulated ncRNAs.
View Article and Find Full Text PDFRecent studies indicate that the development of drug resistance and increased invasiveness in melanoma is largely driven by transcriptional plasticity rather than canonical coding mutations. Understanding the mechanisms behind cell identity shifts in oncogenic transformation and cancer progression is crucial for advancing our understanding of melanoma and other aggressive cancers. While distinct melanoma phenotypic states have been well characterized, the processes and transcriptional controls that enable cells to shift between these states remain largely unknown.
View Article and Find Full Text PDFUltraviolet (UV)-induced DNA mutations produce genetic drivers of cutaneous melanoma initiation and numerous neoantigens that can trigger anti-tumor immune responses in the host. Consequently, melanoma cells must rapidly evolve to evade immune detection by simultaneously modulating cell-autonomous epigenetic mechanisms and tumor-microenvironment interactions. Angiogenesis has been implicated in this process; although an increase of vasculature initiates the immune response in normal tissue, solid tumors manage to somehow enhance blood flow while preventing immune cell infiltration.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!