A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Availability of Hypertension and Diabetes Mellitus Care Services at Subdistrict Level in Bangladesh. | LitMetric

Background: In Bangladesh, the rapid rise of noncommunicable diseases (NCDs) has become a significant public health concern. This study assesses the readiness of hypertension (HTN)- and diabetes mellitus-related services at primary health-care facilities in Northeast Bangladesh.

Methodology: A cross-sectional survey using a semi-structured interview was conducted between April 2021 and May 2021 among 51 public primary health-care facility staff (upazila health complexes [UHCs]). The NCD-specific service readiness was assessed using an adapted questionnaire from the WHO manual of Service Availability and Readiness Assessment and included four domains: guidelines and staff, basic equipment, diagnostic facility, and essential medicine. For each domain, the mean readiness index score was calculated. Facilities with a readiness score of above 70% were considered to be ready.

Results: The diagnostic capacity of the UHCs ranged from 0% to 88.9%, the availability of essential medicine and basic equipment varied between 15.4%-69.2% and 36.4%-100%, respectively, whereas the score in availability of basic amenities was between 57.1% and 100%. The score for the protocol drugs used to manage HTN was 52.9%, whereas for diabetes, it was 88.2%. The average general service readiness score for the facilities was 59.1%. Overall 17.6% of the facilities were assessed to be ready.

Conclusion: Currently, primary health-care facilities are not ready to implement the national guidelines for diagnosing and treating diabetes and HTN due to shortages of medications, staff, and diagnostic materials.

Download full-text PDF

Source
http://dx.doi.org/10.4103/WHO-SEAJPH.WHO-SEAJPH_53_22DOI Listing

Publication Analysis

Top Keywords

primary health-care
12
readiness score
12
health-care facilities
8
service readiness
8
basic equipment
8
essential medicine
8
readiness
6
facilities
5
score
5
availability
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!