A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Reducing non-value added (NVA) activities through lean tools for the precast industry. | LitMetric

Lean management is a strategic approach that is used in construction industry, specifically aims at minimizing and ultimately eliminating non-value-adding activities, commonly referred to as waste, within construction projects. However, an increase in non-value added (NVA) activities within the precast industry has the potential to diminish both productivity and efficiency. The aim of this paper is to investigate the use of lean tools for minimizing NVA activities in the construction industry. A comprehensive literature review, the study identified Unnecessary Inventory (UI), Waiting Time (WT), Overproduction (OP), and Unnecessary Movement (UM) as major NVA activities that affect the precast industry. A structured questionnaire was designed and conducted among precast industry professionals and lean experts to collect data. The data was then analyze using partial least square test-structural equation modelling, including reliability and validity tests, to ensure data quality. Results indicated that the precast industry professionals widely utilized Just-in-time (JIT), Continuous Improvement (CI), and Total Quality Management (TQM) as lean tools to reduce NVA activities. A conceptual path model was developed to assess the impact of Lean tools on NVA activities. The results of the analysis reveal a strong positive relationship between Lean tools and NVA activities, with a β value of 0.654. The findings of this study can be used for improving the productivity of construction projects by focusing on how to minimize NVA activities using lean tools in precast industry.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11021972PMC
http://dx.doi.org/10.1016/j.heliyon.2024.e29148DOI Listing

Publication Analysis

Top Keywords

nva activities
32
lean tools
24
precast industry
24
activities
9
nva
8
non-value nva
8
lean
8
activities lean
8
tools precast
8
industry
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!