Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The impact of projects is vital, from business operations to research to the national economy. Therefore, management science and operation research have extensively studied project scheduling and resource allocation for over six decades. Project databases were proposed to test algorithms, including simulated or real, single or multiprojects, and single-mode or multi-mode projects. However, the dozens of project databases are extremely heterogeneous regarding the file structure and the features of the modeled projects. Furthermore, the efficiency and performance of project scheduling and resource allocation algorithms are susceptible to the characteristics of projects. Therefore, the proposed Compound Matrix-Based Project Database (CMPD) collects and consolidates the most frequently used project databases. The proposed Unified Matrix-Based Project-Planning Model (UMP) sparse matrix-based model enables the addition of new features to existing project structures, such as completion priorities, structural flexibility, and quality parameters, to broaden the scope of considered projects and to take account of flexible approaches, such as agile, extreme, and hybrid projects.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10973526 | PMC |
http://dx.doi.org/10.1038/s41597-024-03154-x | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!