A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

When tomorrow comes: A prospective risk assessment of a future artificial general intelligence-based uncrewed combat aerial vehicle system. | LitMetric

There are concerns that Artificial General Intelligence (AGI) could pose an existential threat to humanity; however, as AGI does not yet exist it is difficult to prospectively identify risks and develop requisite controls. We applied the Work Domain Analysis Broken Nodes (WDA-BN) and Event Analysis of Systemic Teamwork-Broken Links (EAST-BL) methods to identify potential risks in a future 'envisioned world' AGI-based uncrewed combat aerial vehicle system. The findings suggest five main categories of risk in this context: sub-optimal performance risks, goal alignment risks, super-intelligence risks, over-control risks, and enfeeblement risks. Two of these categories, goal alignment risks and super-intelligence risks, have not previously been encountered or dealt with in conventional safety management systems. Whereas most of the identified sub-optimal performance risks can be managed through existing defence design lifecycle processes, we propose that work is required to develop controls to manage the other risks identified. These include controls on AGI developers, controls within the AGI itself, and broader sociotechnical system controls.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.apergo.2024.104245DOI Listing

Publication Analysis

Top Keywords

risks
11
artificial general
8
uncrewed combat
8
combat aerial
8
aerial vehicle
8
vehicle system
8
sub-optimal performance
8
performance risks
8
goal alignment
8
alignment risks
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!