A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Data exploration on the factors associated with cost overrun on social housing projects in Trinidad and Tobago. | LitMetric

Data exploration on the factors associated with cost overrun on social housing projects in Trinidad and Tobago.

Data Brief

Department of Civil and Environmental Engineering, The Faculty of Engineering, The University of West Indies, St. Augustine 32080, Trinidad and Tobago.

Published: February 2024

This data article explores the factors that contribute to cost overrun on public sector projects within Trinidad and Tobago. The data was obtained through literature research, and structured questionnaires, designed using open-ended questions and the Likert scale. The responses were gathered from project actors and decision-makers within the public and private construction industry, mainly, project managers, contractors, engineers, architects, and consultants. The dataset was analysed using frequency, simple percentage, mean, risk impact, and fuzzy logic via the fuzzy synthetic evaluation method (FSE). The significance of the analysed data is to determine the critical root causes of cost overrun which affect public sector infrastructure development projects (PSIDPs), from being completed on time and within budget. The dataset is most useful to project and construction management professionals and academia, to provide additional insight into the understanding of the leading factors associated with cost overrun and the critical group in which they occur (political factors). Such understanding can encourage greater decisions under uncertainty and complexity, thus accounting for and reducing cost overrun on public sector projects.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10788219PMC
http://dx.doi.org/10.1016/j.dib.2023.109966DOI Listing

Publication Analysis

Top Keywords

cost overrun
20
public sector
12
factors associated
8
associated cost
8
projects trinidad
8
trinidad tobago
8
tobago data
8
overrun public
8
sector projects
8
cost
5