A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Wet anaerobic digestion of organic fraction of municipal solid waste: experience with long-term pilot plant operation and industrial scale-up. | LitMetric

Wet anaerobic digestion of organic fraction of municipal solid waste: experience with long-term pilot plant operation and industrial scale-up.

Bioprocess Biosyst Eng

Chemical Engineering Department, Faculty of Chemistry, Universidad Nacional Autónoma de México, Circuito de La Investigación Científica, 04510, Mexico City, Mexico.

Published: February 2024

This paper presents the analysis of a pilot anaerobic digestion plant that operates with organic fraction of municipal solid waste (OFMSW) from a wholesale market and can treat up to 500 kg d. The process was monitored for a period of 524 days during which the residue was characterized and the biogas production and methane content were recorded. The organic load rate (OLR) of volatile solids (VS) was 0.89 kg m d and the Hydraulic Retention Time (HRT) was 25 d during the process. The yield was 82 Nm tons OFMSW biogas, equivalent to 586 Nm tons CH VS. The results obtained in the pilot plant were used to carry out a technical-economic evaluation of a plant that treats 50 tons of OFMSW from wholesale markets. A production of 3769 Nm d of biogas and 2080 Nm d of methane is estimated, generating 35.1 MWh d when converted to electricity.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10867089PMC
http://dx.doi.org/10.1007/s00449-023-02958-2DOI Listing

Publication Analysis

Top Keywords

anaerobic digestion
8
organic fraction
8
fraction municipal
8
municipal solid
8
solid waste
8
pilot plant
8
ofmsw wholesale
8
tons ofmsw
8
wet anaerobic
4
digestion organic
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!