A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Grouting anchor cable active advanced support technology for mining roadways. | LitMetric

Because of the deficiencies in safety and economy of the single hydraulic prop passive advanced support, the grouting anchor cable active advanced support technology is proposed with the Changping Coal Mine 53,081 roadway as the engineering background. By using a combination of theoretical analysis, laboratory tests, numerical simulation, and field tests, the influence of different grouting parameters on the diffusion law of grout is studied. Considering the effect of the stress field on grout migration, a grout seepage-stress coupling model is established. Grouting material ratio tests are carried out and grout parameters are tested. The grouting part of the advanced grouting anchor cable is modeled and solved using the COMSOL Multiphysics numerical software. The results show that the grouting material selected is Portland cement 42.5 and water glass double liquid grout, with a slurry ratio of 15% ACZ-1 type additive and 4% water glass content, and a water-cement ratio of 0.6. The grouting pressure for the 53,081 roadway grouting anchor cable advanced support is 5 MPa, the grouting time is 6 min, and the grouting anchor cable spacing is 2000 mm × 1000 mm. The engineering application shows that the maximum roof subsidence is 180 mm, the maximum separation value at a depth of 9 m is 24 mm, and the maximum separation value at a depth of 3 m is 90 mm. The research results have achieved effective advanced support for the 53,081 roadway, replacing the single hydraulic prop, and provided a theoretical basis for the subsequent design of advanced support parameters for mining roadways.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10533882PMC
http://dx.doi.org/10.1038/s41598-023-43483-2DOI Listing

Publication Analysis

Top Keywords

advanced support
24
grouting anchor
20
anchor cable
20
53081 roadway
12
grouting
11
cable active
8
active advanced
8
support technology
8
mining roadways
8
single hydraulic
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!