In this extant paper, a multivariate time series model using the seemingly unrelated times series equation (SUTSE) framework is proposed to forecast the peak and short-term electricity demand using time series data from February 2, 2014, to August 2, 2018. Further the Markov Chain Monte Carlo (MCMC) method, Gibbs Sampler, together with the Kalman Filter were applied to the SUTSE model to simulate the variances to predict the next day's peak and electricity demand. Relying on the study results, the running ergodic mean showed the convergence of the MCMC process. Before forecasting the peak and short-term electricity demand, a week's prediction from the 28th to the 2nd of August of 2018 was analyzed and it found that there is a possible decrease in the daily energy over time. Further, the forecast for the next day (August 3, 2018) was about 2187 MW and 44090 MWh for the peak and electricity demands respectively. Finally, the robustness of the SUTSE model was assessed in comparison to the SUTSE model without MCMC. Evidently, SUTSE with the MCMC method had recorded an accuracy of about 96% and 95.8% for Peak demand and daily energy respectively.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10457419PMC
http://dx.doi.org/10.1016/j.heliyon.2023.e18821DOI Listing

Publication Analysis

Top Keywords

electricity demand
16
time series
12
peak short-term
12
short-term electricity
12
august 2018
12
sutse model
12
seemingly unrelated
8
series model
8
forecasting peak
8
monte carlo
8