Application of neural networks and neuro-fuzzy models in construction scheduling.

Sci Rep

Department of Civil Engineering, Michael Okpara University of Agriculture, Umudike, P. M. B. 7267, Umuahia, 440109, Abia State, Nigeria.

Published: May 2023

Construction scheduling is a complex process that involves a large number of variables, making it difficult to develop accurate and efficient schedules. Traditional scheduling techniques rely on manual analysis and intuition, which are prone to errors and often fail to account for all the variables involved. This results in project delays, cost overruns, and poor project performance. Artificial intelligence models have shown promise in improving construction scheduling accuracy by incorporating historical data, site-specific conditions, and other variables that traditional scheduling methods may not consider. In this research study, application of soft-computing techniques to evaluate construction schedule and control of project activities in order to achieve optimal performance in execution of building projects were carried out. Artificial neural network and neuro-fuzzy models were developed using data extracted from a residential two-storey reinforced concrete framed-structure construction schedule and project execution documents. The evaluation of project performance indicators in earned value analysis from 0 to 100% progress at 5% increment with a total of seventeen tasks were carried out using Microsoft Project software and data obtained from the computation were utilized for model development. Using input-output and curve-fitting (nftool) function in MATLAB, a 6-10-1 two-layer feed-forward network with tansig activation-function (AF) for the hidden neurons and linear AF output neurons was generated with Levenberg-Marquardt (Trainlm) training algorithm. Similarly, with the aid of ANFIS toolbox in MATLAB software, the training, testing and validation of the ANFIS model were carried out using hybrid optimization learning algorithm at 100 epochs and the Gaussian-membership-function (gaussmf). Loss-function parameters namely MAE, RMSE and R-values were taken as the performance evaluation criteria of the developed models. The generated statistical results indicates no significant difference between model-results and experimental values with MAE, RMSE, R of 1.9815, 2.256 and 99.9% respectively for ANFIS-model and MAE, RMSE, R of 2.146, 2.4095 and 99.998% respectively for the ANN-model. The model performance indicated that the ANFIS-model outclassed the ANN-model with their results satisfactory to deal with complex relationships between the model variables to produce accurate target response. The findings from this research study will improve the accuracy of construction scheduling, resulting in improved project performance and reduced costs.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10200797PMC
http://dx.doi.org/10.1038/s41598-023-35445-5DOI Listing

Publication Analysis

Top Keywords

construction scheduling
16
project performance
12
mae rmse
12
neuro-fuzzy models
8
traditional scheduling
8
construction schedule
8
project
7
construction
6
scheduling
6
performance
6

Similar Publications

The paper addresses the economic operation optimization problem of photovoltaic charging-swapping-storage integrated stations (PCSSIS) in high-penetration distribution networks. It proposes a dual-layer optimization scheduling model for PCSSIS clusters and distribution network systems. Firstly, a master-slave game model is constructed.

View Article and Find Full Text PDF

Community violence is a major cause of injury and death in the USA. Empirical studies have identified that some place-based interventions of urban private places, such as remediations of vacant lots and buildings, are associated with reductions in community violence in surrounding areas. The aim of this study was to examine whether routine maintenance and repair of urban public places (e.

View Article and Find Full Text PDF

To address the power supply-demand imbalance caused by the uncertainty in wind turbine and photovoltaic power generation in the regional integrated energy system, this study proposes a bi-level optimization strategy that considers the uncertainties in photovoltaic and wind turbine power generation as well as demand response. The upper-level model analyzes these uncertainties by modeling short-term and long-term output errors using robust optimization theory, applies an improved stepwise carbon trading model to control carbon emissions, and finally constructs an electricity-hydrogen-carbon cooperative scheduling optimization model to reduce wind and carbon emissions. The lower-level model incentivizes users to participate in integrated demand response through dynamic energy pricing, thereby reducing the annual consumption cost of load aggregator.

View Article and Find Full Text PDF

The production stage of an automated job shop is closely linked to the automated guided vehicle (AGV), which needs to be planned in an integrated manner to achieve overall optimization. In order to improve the collaboration between the production stages and the AGV operation system, a two-layer scheduling optimization model is proposed for simultaneous decision making of batching problems, job sequences and AGV obstacle avoidance. Under the AGV automatic path seeking mode, this paper adopts a data-driven Bayesian network method to portray the transportation time of AGVs based on the historical operation data to control the uncertainty of the transportation time of AGVs.

View Article and Find Full Text PDF

Event-based sliding mode control for singularly perturbed systems with switching parameters.

ISA Trans

December 2024

School of Mathematics and Statistics, Guangxi Normal University, Guilin 541006, China. Electronic address:

This paper addresses the event-based sliding mode control problem for singularly perturbed systems with switching parameters. Unlike traditional Markovian switching systems, singularly perturbed S-MSSs allow more flexible state transitions, which can be described by a general distribution rather than the exponential distribution assumed in Markovian switching systems. To enhance the performance of such systems, a novel memory-based dynamic event-triggered protocol (DETP) is proposed, incorporating a memory term for the auxiliary offset variable.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!