Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The engineering-geological study deals with the study of significance and relationship of soil and rock workability (factor representing the engineering-geological structure of rock massif) and the remaining earthwork parameters influencing the cost of construction work, such as excavation type and its technology, and excavated cubic volume. The comparative tool was the cost of earthwork as it reflects the real value of the given parameters during the implementation of earthwork. Soil and rock workability is the most important parameter of rock massif engineering-geological structure during any earthwork. The investor pays the contractor for earthwork based on workability classes which have their accounting value expressed as a volume unit of earthwork per particular project. The research results arise from a comparison of 6 sewer system construction project case studies in the north-east of the Czech Republic. The research shows that the most important factor during the implementation of earthwork is the specific engineering-geological structure (52%), which reflects in the parameter of soil and rock workability classes, using which all earthwork is priced. The second most important factor (33%) is the type of excavation and its technology. The least important is the excavated cubic volume (15%), which means the overall cubic volume of earthwork. The results were obtained within three evaluation approaches, where the comparison unit was one cubic meter of excavated volume during earthwork.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10068602 | PMC |
http://dx.doi.org/10.1038/s41598-023-31859-3 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!