A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Engineering-geological study of relationships between soil and rock workability, type and volume of excavated materials, and earthwork costs (six case studies). | LitMetric

The engineering-geological study deals with the study of significance and relationship of soil and rock workability (factor representing the engineering-geological structure of rock massif) and the remaining earthwork parameters influencing the cost of construction work, such as excavation type and its technology, and excavated cubic volume. The comparative tool was the cost of earthwork as it reflects the real value of the given parameters during the implementation of earthwork. Soil and rock workability is the most important parameter of rock massif engineering-geological structure during any earthwork. The investor pays the contractor for earthwork based on workability classes which have their accounting value expressed as a volume unit of earthwork per particular project. The research results arise from a comparison of 6 sewer system construction project case studies in the north-east of the Czech Republic. The research shows that the most important factor during the implementation of earthwork is the specific engineering-geological structure (52%), which reflects in the parameter of soil and rock workability classes, using which all earthwork is priced. The second most important factor (33%) is the type of excavation and its technology. The least important is the excavated cubic volume (15%), which means the overall cubic volume of earthwork. The results were obtained within three evaluation approaches, where the comparison unit was one cubic meter of excavated volume during earthwork.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10068602PMC
http://dx.doi.org/10.1038/s41598-023-31859-3DOI Listing

Publication Analysis

Top Keywords

soil rock
16
rock workability
16
engineering-geological structure
12
cubic volume
12
earthwork
11
engineering-geological study
8
case studies
8
rock massif
8
technology excavated
8
excavated cubic
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!