In this paper, we take the four-way shuttle system as the research object and establish the mathematical model of scheduling optimization based on the minimum time for the in/out operation optimization and path optimization scheduling problems of the four-way shuttle system. An improved genetic algorithm is used to solve the task planning, and an improved A* algorithm is used to solve the path optimization within the shelf level. The conflicts generated by the parallel operation of the four-way shuttle system are classified, and the improved A* algorithm based on the time window method is constructed for path optimization through the dynamic graph theory method to seek safe conflict-free paths. Through simulation example analysis, it is verified that the improved A* algorithm proposed in this paper has obvious optimization effect on the model of this paper.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC10006453 | PMC |
http://dx.doi.org/10.1038/s41598-023-31050-8 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!