A major full-scale experiment (the TULIP - Tunneling and Limitations on the Impact on Piles - research project) was conducted in 2020 on Line 16 of the Grand Paris Express project (France). Its objective was to analyze the tunnel boring machine-soil-pile interactions occurring during tunnel excavation near piled structures in the context of the geology of the Paris basin. This data paper summarizes the main measurements made during this experiment, namely: (i) the horizontal and vertical displacements measured in the ground, on the surface and in the thickness of the cover, (ii) the settlements of the pile heads, and the variations of the normal forces in the pile depth. These data, interpreted in two articles cited in the references, may be of interest for the calibration of analytical and numerical models dedicated to the estimation of the impact of TBM excavation on neighboring constructions, in particular those based on piles.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9982606PMC
http://dx.doi.org/10.1016/j.dib.2023.108971DOI Listing

Publication Analysis

Top Keywords

impact tunnelling
4
piles
4
tunnelling piles
4
piles parisian
4
parisian subsoil
4
subsoil dataset
4
dataset in-situ
4
in-situ measurements
4
measurements ground
4
ground three
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!