Objective: To develop a prediction nomogram for the risk of lung-related diseases (LRD) in construction workers.

Methods: Seven hundred and fifty-two construction workers were recruited. A self- designed questionnaire was performed to collected relevant information. Chest X-ray was taken to judge builders' lung health. The potential predictors subsets of the risk of LRD were screened by the least absolute shrinkage and selection operator regression and univariate analysis, and determined by using multivariate logistic regression analysis, then were used for developing a prediction nomogram for the risk of LRD. C-index, calibration curve, receiver operating characteristic curve, decision curve analysis (DCA) and clinical impact curve analysis (CICA) were used to evaluation the identification, calibration, predictive ability and clinical effectiveness of the nomogram.

Results: Five hundred and twenty-six construction workers were allocated to training group and 226 to validation group. The predictors included in the nomogram were symptoms, years of dust exposure, work in shifts and labor intensity. Our model showed good discrimination ability, with a bootstrap-corrected C index of 0.931 (95% CI = 0.906-0.956), and had well-fitted calibration curves. The area under the curve (AUC) of the nomogram were (95% CI = 0.906-0.956) and 0.945 (95% CI = 0.891-0.999) in the training and validation groups, respectively. The results of DCA and CICA indicated that the nomogram may have clinical usefulness.

Conclusion: We established and validated a novel nomogram that can provide individual prediction of LRD for construction workers. This practical prediction model may help occupational physicians in decision making and design of occupational health examination.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9792134PMC
http://dx.doi.org/10.3389/fpubh.2022.1032188DOI Listing

Publication Analysis

Top Keywords

construction workers
16
lung-related diseases
8
prediction nomogram
8
nomogram risk
8
lrd construction
8
risk lrd
8
curve analysis
8
95% 0906-0956
8
nomogram
7
construction
5

Similar Publications

Virtual Reality Training System (VRTS) has been verified effective in safety training in the construction field. However, in China, it is not widely used as a regular training tool. Among all the reasons, the acceptance level of construction workers (CWs) has the decisive impact on the promotion of VRTS.

View Article and Find Full Text PDF

Objectives: As a population at high risk for psychological distress, healthcare workers typically experience varying degrees of anxiety, depression, and burnout. Studies have found that depression and anxiety have a negative impact on the mental health domain of burnout in healthcare workers. However, little is known about the symptom-to-symptom interactions between these psychological outcomes.

View Article and Find Full Text PDF

Electrical burns are an uncommon type of burn that can cause serious disabilities and mortality. This study aims to provide preventive strategies to investigate high-risk areas of electrical damage in Tehran Province. This is a descriptive cross-sectional study performed on patients with electrical burns referred to Shahid Motahari Educational and Medical Center during 2015-2017.

View Article and Find Full Text PDF

Background: Care planning with people with advanced heart failure enables appropriate care, and prevents futile interventions, such as cardio-pulmonary resuscitation (CPR).

Aim: To explore what motivates clinicians to conduct, and people with heart failure and their carers, to engage in well-conducted CPR discussions.

Methods: In-depth remote interviews with i) people with heart failure and self-reported daily symptoms (≥ 3 months), ii) informal carers and, iii) clinicians recruited through social media and professional groups, team contacts and snowballing.

View Article and Find Full Text PDF

Background: In Japan, the escalating demand for anesthesia services has resulted in a shortage of anesthesiologists, presenting a societal challenge. Urgent measures involve the imperative task shifting to nurses. The perspectives of anesthesiologists on perianesthesia nurses (PANs) and the PAN system significantly influence the collaboration between anesthesiologists and PANs.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!