A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Short-term hydromorphological and ecological responses of using woody structures for river restoration in a tailing-impacted tropical river. | LitMetric

Gualaxo do Norte River (GNR), in southeastern Brazil, was impacted by iron ore tailings from the Fundão Dam rupture (November 2015). The deposition of tailings on the riverbed has changed the hydrogeomorphological characteristics of the GNR, resulting in a decrease in the diversity of physical habitats and ecological biodiversity. As part of the process of restoration and management of this damaged ecosystem, the river restoration project ReNaturalize was implemented to restructure the geomorphological characteristics and the physical habitat and to enhance the reestablishment of biota, mainly for macroinvertebrates and fishes. For this goal, 203 wooden structures, such as tree trunks, branches, and grass were installed in two sections of GNR (T6R and T7R), totaling 1.8 km long. The effectiveness of the project was evaluated by an assessment that followed a before and after and control and impacted (BACI) design. Upstream of each Restored reach there is a Control and a Reference reach. Four campaigns were carried out, two before and two after the restoration process. After 14 months of the woody installation, an increase in hydraulic retention in the restored reaches was observed (T6R-20.2%; T7R-63.5%), when compared with the Control reaches, which favored the accumulation of sediments (T6R-388 metric tons; T7R-396 metric tons). This enhanced the formation of natural tailings barriers and promoted the enrichment of substrate types (T6R-39.2%; T7R-43%). The benthic macroinvertebrate community showed an increase in the total abundance (T6-110%), including the most sensitive groups (T6R-124%; T7R-124%). For fish, the increase was up to 81.38% with hand nets capture, indicating the recruitment of juveniles, and the abundance and the biomass of some species were also higher (up to 100%) than the Control reaches. The results indicated that the Restored reach is already qualitatively and quantitatively better than the Control reach and similar to the Reference reach, indicating the success of the study. Integr Environ Assess Manag 2023;19:648-662. © 2022 SETAC.

Download full-text PDF

Source
http://dx.doi.org/10.1002/ieam.4721DOI Listing

Publication Analysis

Top Keywords

river restoration
8
restored reach
8
reference reach
8
control reaches
8
metric tons
8
control
5
reach
5
short-term hydromorphological
4
hydromorphological ecological
4
ecological responses
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!