Western blotting experiments were initially performed to detect a target protein in a complex biological sample and more recently, to measure relative protein abundance. Chemiluminescence coupled with film-based detection was traditionally the gold standard for western blotting but accurate and reproducible quantification has been a major challenge from this methodology. The development of sensitive, camera-based detection technologies coupled with an updated technical approach permits the production of reproducible, quantitative data. Fluorescence reagent and detection solutions are the latest innovation in western blotting but there remains questions and debate concerning their relative sensitivity and dynamic range versus chemiluminescence. A methodology to optimize and produce excellent, quantitative western blot results with rigorous data analysis from membranes probed with both fluorescent and chemiluminescent antibodies is described. The data reveal when and how to apply these detection methods to achieve reproducible data with a stepwise approach to data processing for quantitative analysis.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9585080 | PMC |
http://dx.doi.org/10.1038/s41598-022-22294-x | DOI Listing |
Cancer Cell Int
January 2025
Key Laboratory of Endemic and Ethnic Diseases, Ministry of Education & Key Laboratory of Medical Molecular Biology of Guizhou Province, Guizhou Medical University, 9 Beijing Road, Guiyang, Guizhou, 550004, P. R. China.
Background: XB130, a classical adaptor protein, exerts a critical role in diverse cellular processes. Aberrant expression of XB130 is closely associated with tumorigenesis and aggressiveness. However, the mechanisms governing its expression regulation remain poorly understood.
View Article and Find Full Text PDFCell Commun Signal
January 2025
Department of Cell and Molecular Biology, College of Medicine, Chang Gung University, 259 Wen-Hwa 1 road, Guishan District, Taoyuan, Taiwan.
Background: The Golgi apparatus is widely considered a secretory center and a hub for different signaling pathways. Abnormalities in Golgi dynamics can perturb the tumor microenvironment and influence cell migration. Therefore, unraveling the regulatory network of the Golgi and searching for pharmacological targets would facilitate the development of novel anticancer therapies.
View Article and Find Full Text PDFExp Eye Res
January 2025
The First Affiliated Hospital of Chongqing Medical University, Chongqing, China. Electronic address:
Retinopathy of prematurity (ROP) is a proliferative retinal vascular disorder that critically affects the visual development of premature infants, potentially leading to irreversible vision loss or even blindness. Despite its significance, the underlying mechanisms of this disease remain insufficiently understood. In this study, we utilized the oxygen-induced retinopathy (OIR) mouse model and conducted endothelial functional assays to explore the role of Sterol Regulatory Element-Binding Protein 1 (SREBF1) in ROP pathogenesis.
View Article and Find Full Text PDFJ Ethnopharmacol
January 2025
State Key Laboratory of Medicinal Chemical Biology, College of Pharmacy and Tianjin Key Laboratory of Molecular Drug Research, Nankai University, Tianjin 300353, People's Republic of China. Electronic address:
Ethnopharmacological Relevance: The whole plant of Laggera alata is frequently utilize to remedy inflammatory diseases including nephritis as a traditional Chinese medicine. However, its active ingredients and mechanism of action against sepsis-associated acute kidney injury (SA-AKI) are unknown.
Aim Of The Study: This study aimed to identify active compounds from L.
J Ethnopharmacol
January 2025
Northeast Asia Research Institute of Traditional Chinese Medicine, Changchun University of Chinese Medicine, Changchun 130117, Jilin Province, China; Affiliated Hospital of Changchun University of Traditional Chinese Medicine, Changchun University of Chinese Medicine, Changchun 130117, Jilin Province, China. Electronic address:
Ethnopharmacological Relevance: Type 2 diabetic osteoporosis (T2DOP) is a metabolic bone disease characterized by impaired bone structure and decreased bone strength in diabetic patients. Jiangu Decoction (JGD), a traditional Chinese poly-herbal formulation, has shown efficacy in mitigating osteoporosis (OP) and fractures caused by osteoporosis in diabetic patients in clinical trials. In addition, JGD has been proven to promote the proliferation of osteoblasts.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!