A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Performance and microbial community of MBBRs under three maintenance strategies for intermittent stormwater treatment. | LitMetric

Performance and microbial community of MBBRs under three maintenance strategies for intermittent stormwater treatment.

Sci Total Environ

Shanghai Engineering Research Center of Energy - Saving in Heat Exchange Systems, College of Environmental and Chemical Engineering, Shanghai University of Electric Power, Shanghai 200090, China; Shanghai Institute of Pollution Control and Ecological Security, Shanghai 200092, China. Electronic address:

Published: December 2022

Maintaining microbial activities is a critical problem for biological treatment processes of stormwater runoff because of its intermittent nature. In this study, the suitability of the moving bed biofilm reactor (MBBR) was assessed for stormwater treatment by long-term dry - rainy alternation operation. Three strategies to maintain microbial activities during the dry period, including keeping idle (MBBR), introducing river water throughout the period (MBBR), and ahead of a rainy day (MBBR), were investigated. COD and NH-N removal efficiencies declined linearly from 94.2 % and 94.7 % to 51.7 % and 64.6 %, respectively, after the 61-day operation with microbial activity and biomass decreased. Introducing river water adversely affected the process performance as MBBR presented the highest declining rates of COD and NH-N removal efficiencies. Most genera in MBBRs decayed and their microbial communities developed towards individualization, especially in MBBR because of its highest environmental variability. Keeping idle slightly alleviated the performance decline and formed a more stable microbial community structure. However, significantly deteriorating performance in all MBBRs after the long-term operation indicated that MBBRs were unsuitable for treating stormwater independently of intermittent nature.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.scitotenv.2022.158578DOI Listing

Publication Analysis

Top Keywords

microbial community
8
stormwater treatment
8
microbial activities
8
intermittent nature
8
keeping idle
8
introducing river
8
river water
8
cod nh-n
8
nh-n removal
8
removal efficiencies
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!