In seismic assessment of continuous girder bridges, plastic hinges form in bridge piers to dissipate seismic energy through nonlinear restoring forces. Considering temporal and spatial variations of ground motions, seismic evaluation of the bridges involves nonlinear stochastic vibration and expensive computation. This paper presents an approach to significantly increase the efficiency of seismic evaluation for continuous girder bridges with plastic hinges. The proposed approach converts nonlinear motion equations into quasi-linear state equations, solves the equations using an explicit time-domain dimension-reduced iterative method, and incorporates a stochastic sampling method to statistically analyze the seismic response of bridges under earthquake excitation. Taking a 3 × 30 m continuous girder bridge as an example, fiber beam-column elements are used to simulate the elastic-plastic components of the continuous girder bridge, and the elastic-plastic time history analysis of the continuous girder bridge under non-uniform seismic excitation is carried out. Results show that the computation time is only 5% of the time of the nonlinear time history approach while retaining the accuracy. This study advances the capability of rapid seismic assessment and design for bridges with localized nonlinear behaviors such as plastic hinges.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9415508PMC
http://dx.doi.org/10.3390/s22166311DOI Listing

Publication Analysis

Top Keywords

continuous girder
24
plastic hinges
16
seismic evaluation
12
girder bridges
12
girder bridge
12
rapid seismic
8
evaluation continuous
8
bridges localized
8
seismic assessment
8
bridges plastic
8

Similar Publications

For steel bridges, corrosion has historically led to bridge failures, resulting in fatalities and injuries. To enhance public safety and prevent such incidents, authorities mandate in-situ evaluation and reporting of corroded members. The current inspection and evaluation protocol is characterized by intense labor, traffic delays, and poor capacity predictions.

View Article and Find Full Text PDF

In order to reveal the mechanism of sleeved stud connectors, 15 push-out specimens were designed, and static loading tests were conducted to evaluate the mechanical performance. The shear performance differences between the novel sleeved studs and conventional welded studs were compared. Referring to the experimental results, an Abaqus nonlinear finite element model was established to study the shear mechanism of sleeved stud connectors.

View Article and Find Full Text PDF

Several overloaded-induced overturning incidents of girder bridges with single-column piers have occurred in recent years, resulting in significant casualties and economic losses. Temperature, in addition to overloading, may also play a role in exacerbating bridge overturning. To investigate the association between temperature and bridge overturning, an explicit finite element model (EFEM) of a three-span concrete curved continuous bridge considering nonlinearities was developed to simulate overall collapse.

View Article and Find Full Text PDF

Assembly construction is extensively employed in bridge construction due to its ability to accelerate construction and improve quality. To speed the recovery of bridges after major earthquakes, this study proposes an assembled connection for precast piers and footings based on assembly construction. The precast piers are connected to the footings using ultra-high-performance concrete (UHPC) post-cast cupped sockets.

View Article and Find Full Text PDF

Precision medicine research benefits from machine learning in the creation of robust models adapted to the processing of patient data. This applies both to pathology identification in images, i.e.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!