A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Recent progress in Chinese fusion research based on superconducting tokamak configuration. | LitMetric

Fusion energy is a promising source of clean energy, which could solve energy shortages and environmental pollution. Research into controlled fusion energy has been ongoing for over half a century. China has created a clear roadmap for magnetic confinement fusion development, where superconducting tokamaks will be used in commercial fusion reactors. The Experimental Advanced Superconducting Tokamak (EAST) is the world's first fully superconducting tokamak with upper and lower divertors, which aims at long-pulse, steady-state, H-mode operation, and 101-s H-mode discharge had been achieved. In 2007, China joined the International Thermonuclear Experimental Reactor (ITER) and became one of its seven members. Thirteen procurement packages are undertaken by China, covering superconducting magnets, power supplies, plasma-facing components (PFCs), diagnostics, etc. To bridge the gap between the ITER and fusion demonstration power plants (DEMOs), China is planning to build the Chinese Fusion Engineering Testing Reactor (CFETR) to demonstrate related technologies and physics models. The engineering design of the CFETR was completed in 2020, and Comprehensive Research Facilities for Fusion Technology (CRAFT) are being constructed to explore the key technologies used in the CFETR.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9256834PMC
http://dx.doi.org/10.1016/j.xinn.2022.100269DOI Listing

Publication Analysis

Top Keywords

superconducting tokamak
12
fusion
8
chinese fusion
8
fusion energy
8
superconducting
5
progress chinese
4
fusion based
4
based superconducting
4
tokamak configuration
4
configuration fusion
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!