In the rail industry, unavailability of spare parts can have negative implications such as downtime and financial losses. Long lead times can be experienced in the process of replacing a damaged spare part. Some of the parts are expensive to produce in-house using conventional methods because of the tooling costs. It can be time consuming to wait for suppliers to replace the part if it is not produced locally. Proper maintenance of vehicles requires spare parts to be available timeously. It is necessary to investigate how parts can be produced using locally available technologies and materials. The aim of this study is to analyse potential materials that can be used to produce a rail car component. The use of Additive Manufacturing (AM) to produce parts on demand is a quicker and flexible approach when compared to conventional manufacturing methods. Taking advantage of the flexibility offered by the AM, three alternative high performance materials are considered to reduce the weight, improve functional performance and service life of the part. The performance of all the three materials are tested and analysed using Finite Element Analysis. The results of this study are useful in providing guidance on the development of a suitable process chain for producing the part locally. This demonstrates the capability of AM as a suitable approach for enabling local sustainable production of spare parts for the rail industry.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9120224 | PMC |
http://dx.doi.org/10.1016/j.heliyon.2022.e09405 | DOI Listing |
Sci Rep
December 2024
College of Mechanical and Electrical Engineering, Harbin Engineering University, Harbin, People's Republic of China.
A well-designed scheduling plan that meets the practical constraints of the workshop is crucial for enhancing production efficiency in ship plane block assembly. Unlike traditional flow line scheduling problems, the scheduling optimization problem for ship plane block flow line involves dual resource constraints, including work teams and spare parts supply limitations. This can be seen as a Dual Resource Constrained Blocked Flow Shop Scheduling Problem (DRCBFSP).
View Article and Find Full Text PDFRev Sci Instrum
December 2024
School of Materials Science and Engineering, Georgia Institute of Technology, Atlanta, Georgia 30332, USA.
Well-constructed instruments may continue to perform beyond their manufacturer-supported service lifetime, which is typically limited by computer operating system compatibility or the availability of spare parts. Often, such equipment is condemned to surplus and destroyed. End-of-life plans that retain some of the material and energy used to create scientific instruments are of interest, just as in other manufacturing sectors.
View Article and Find Full Text PDFAccid Anal Prev
December 2024
Traffic Engineering and Safety, CSIR-Central Road Research Institute, India.
Driving is a multifaceted activity involving a complex interplay of cognitive, perceptual, and motor skills, demanding continuous attention on the road. In recent years, the increased integration of automation and digitalization technologies in vehicles has improved drivers' convenience and safety. However, the spare attentional capacity available during automation and the prevalence of various infotainment systems in vehicles enable drivers to perform some secondary tasks not related to driving, which may divert their attention away from the road, increasing the chances of accidents.
View Article and Find Full Text PDFJ Appl Clin Med Phys
December 2024
Institute of Radiation Physics, Lausanne University Hospital and Lausanne University, Lausanne, Switzerland.
Purpose: Treatment planning for CyberKnife (CK) (Accuray, USA) can be performed with Precision (Accuray, USA) or RayStation (RS) (RaySearch Laboratories, Sweden) treatment planning systems (TPS). RaySearch recently released a new version of the CK module in RS 12A. The objective of the study was to compare plan quality between RS 12A and Precision.
View Article and Find Full Text PDFAdv Pharmacol Pharm Sci
December 2024
Department of Pharmaceutics and Social Pharmacy, School of Pharmacy, College of Health Sciences, Addis Ababa University, Addis Ababa, Ethiopia.
Good manufacturing practice (GMP) is a part of quality management that maintains product quality and manages it according to the criteria of fitness for use. The heating, ventilation, and air-conditioning (HVAC) system comprises the equipment, technology, and procedure that ensure product quality through maintaining heat, ventilation, and coolness of pharmaceutical manufacturing firms. The aim of the study was to evaluate the GMP compliance of HVAC systems and assess the opportunities and challenges of improving these systems in pharmaceutical manufacturing companies in Ethiopia.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!