Cancer is among the highly complex disease and renal cell carcinoma is the sixth-leading cause of cancer death. In order to understand complex diseases such as cancer, diabetes and kidney diseases, high-throughput data are generated at large scale and it has helped in the research and diagnostic advancement. However, to unravel the meaningful information from such large datasets for comprehensive and minute understanding of cell phenotypes and disease pathophysiology remains a trivial challenge and also the molecular events leading to disease onset and progression are not well understood. With this goal, we have collected gene expression datasets from publicly available dataset which are for two different stages (I and II) for renal cell carcinoma and furthermore, the TCGA and cBioPortal database have been utilized for clinical relevance understanding. In this work, we have applied computational approach to unravel the differentially expressed genes, their networks for the enriched pathways. Based on our results, we conclude that among the most dominantly altered pathways for renal cell carcinoma, are PI3K-Akt, Foxo, endocytosis, MAPK, Tight junction, cytokine-cytokine receptor interaction pathways and the major source of alteration for these pathways are MAP3K13, CHAF1A, FDX1, ARHGAP26, ITGBL1, C10orf118, MTO1, LAMP2, STAMBP, DLC1, NSMAF, YY1, TPGS2, SCARB2, PRSS23, SYNJ1, CNPPD1, PPP2R5E. In terms of clinical significance, there are large number of differentially expressed genes which appears to be playing critical roles in survival.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC9065671 | PMC |
http://dx.doi.org/10.1038/s41598-022-11143-6 | DOI Listing |
Apoptosis
January 2025
Department of Pharmacology, School of Basic Medical Sciences, Xi'an Jiaotong University, Xi'an, 710061, China.
Tangerine peel is a traditional Chinese herb and has been widely applied in foods and medicine for its multiple pharmacological effects. Erythropoietin receptor (EPOR), a member of the cytokine receptor family, is widely expressed in multiple tissues in especial kidney and plays protective effects in adverse physiological and pathological conditions. We hypothesized that it might be EPOR agonists existing in Tangerine peel bring such renal benefits.
View Article and Find Full Text PDFJ Immunother Cancer
January 2025
Cancer Institute, Xuzhou Medical University, Xuzhou, Jiangsu, China
Background: Siglec-E is an immune checkpoint inhibitory molecule. Expression of Siglec-E on the immune cells has been shown to promote tumor regression. This study aimed to develop an adenovirus (Ad) vaccine targeting Siglec-E and carbonic anhydrase IX (CAIX) (Ad-Siglec-E/CAIX) and to evaluate its potential antitumor effects in several preclinical renal cancer models.
View Article and Find Full Text PDFJ Immunother Cancer
January 2025
National Translational Science Center for Molecular Medicine & Department of Cell Biology, Fourth Military Medical University, Xi'an, Shaanxi, China
Background: Clear cell renal cell carcinoma (ccRCC) is the most common histologic type of RCC. However, the spatial and functional heterogeneity of immunosuppressive cells and the mechanisms by which their interactions promote immunosuppression in the ccRCC have not been thoroughly investigated.
Methods: To further investigate the cellular and regional heterogeneity of ccRCC, we analyzed single-cell and spatial transcriptome RNA sequencing data from four patients, which were obtained from samples from multiple regions, including the tumor core, tumor-normal interface, and distal normal tissue.
Int J Urol
January 2025
Department of Urology, Dokkyo Medical University Saitama Medical Center, Saitama, Japan.
Background: C-reactive protein (CRP) is a prognostic biomarker for clear cell renal cell carcinoma (ccRCC). However, there may be potential racial heterogeneity in distribution and prognostic impact of CRP level. We investigated potential racial differences in distribution and prognostic impact of preoperative CRP among Asian (AS), African American (AA), and Caucasian (CAUC) patients with non-metastatic ccRCC (nmccRCC).
View Article and Find Full Text PDFMol Metab
January 2025
Department of Internal Medicine, University of Michigan, Ann Arbor, MI USA; Department of Molecular and Integrative Physiology, University of Michigan, Ann Arbor, MI, USA. Electronic address:
Several groups of neurons in the NTS suppress food intake, including Prlh-expressing neurons (NTS cells). Not only does the artificial activation of NTS cells decrease feeding, but also the expression of Prlh (which encodes the neuropeptide PrRP) and neurotransmission by NTS neurons contributes to the restraint of food intake and body weight, especially in animals fed a high fat diet (HFD). We used animals lacking PrRP receptors GPR10 and/or GRP74 (encoded by Prlhr and Npffr2, respectively) to determine roles for each in the restraint of food intake and body weight by the increased expression of Prlh in NTS neurons (NTS mice) and in response to the anorectic PrRP analog, p52.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!