A technoeconomic analysis (TEA) and life cycle assessment (LCA) was conducted on the use of landfill gas (LFG) for electricity generation using an internal combustion engine. This study provides insights that can guide LFG waste to energy (WTE) operators on decisions concerning installation of contaminant removal from LFG for electricity generation. Four scenarios were analyzed; the first (Scenario 1) was a facility with a single siloxane removal unit (SREU) sized for 6 months of continuous use, the second (Scenario 2) was a facility with parallel SREUs sized for one month of use, the third (Scenario 3) was a facility with no SREU, and the fourth was a facility that flared all LFG captured. The TEA revealed that the chiller cost was over 50% the total purchase cost of the LFG pre-treatment system. When the complete LFG to electricity process was analyzed, the internal combustion engine had the highest percentage of total capital investment and the total annual cost. For the base case, it became economically beneficial to install a SREU at facilities with LFG flowrates greater than ∼2000 m/h. Sensitivity analysis showed that at a base case of 1700 m/h, LFG (50% CH), and 50 mg/m D4, the net income of facilities in Scenarios 1 to 3 became positive at an electricity sales price greater than 5.5 cents/kWh. LCA revealed that Scenario 2 had the greatest CO emission reduction. Scenario 3 is observed to save less CO emissions as biogas flowrate increases due to frequent engine shutdowns. Although there are differences in the global warming potential (GWP 100) for Scenarios 1 to 3, with Scenario 2 being the best and Scenario 3 being the worst, the differences are very small. For this reason, economics alone are sufficient in decision making.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1016/j.jenvman.2022.115070 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!