A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Model-Based Meta-Analysis of Relapsing Mouse Model Studies from the Critical Path to Tuberculosis Drug Regimens Initiative Database. | LitMetric

Tuberculosis (TB), the disease caused by Mycobacterium tuberculosis (Mtb), remains a leading infectious disease-related cause of death worldwide, necessitating the development of new and improved treatment regimens. Nonclinical evaluation of candidate drug combinations via the relapsing mouse model (RMM) is an important step in regimen development, through which candidate regimens that provide the greatest decrease in the probability of relapse following treatment in mice may be identified for further development. Although RMM studies are a critical tool to evaluate regimen efficacy, making comprehensive "apples to apples" comparisons of regimen performance in the RMM has been a challenge in large part due to the need to evaluate and adjust for variability across studies arising from differences in design and execution. To address this knowledge gap, we performed a model-based meta-analysis on data for 17 unique regimens obtained from a total of 1592 mice across 28 RMM studies. Specifically, a mixed-effects logistic regression model was developed that described the treatment duration-dependent probability of relapse for each regimen and identified relevant covariates contributing to interstudy variability. Using the model, covariate-normalized metrics of interest, namely, treatment duration required to reach 50% and 10% relapse probability, were derived and used to compare relative regimen performance. Overall, the model-based meta-analysis approach presented herein enabled cross-study comparison of efficacy in the RMM and provided a framework whereby data from emerging studies may be analyzed in the context of historical data to aid in selecting candidate drug combinations for clinical evaluation as TB drug regimens.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC8923195PMC
http://dx.doi.org/10.1128/AAC.01793-21DOI Listing

Publication Analysis

Top Keywords

model-based meta-analysis
12
relapsing mouse
8
mouse model
8
studies critical
8
drug regimens
8
candidate drug
8
drug combinations
8
probability relapse
8
rmm studies
8
regimen performance
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!