A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Development of the Level of Preventive Action Method by Observation of the Characteristic Value for the Assessment of Occupational Risks on Construction Sites. | LitMetric

Development of the Level of Preventive Action Method by Observation of the Characteristic Value for the Assessment of Occupational Risks on Construction Sites.

Int J Environ Res Public Health

Applied Intelligent Systems Research Group, Department of Physical Activity and Sports Sciences, Campus of International Excellence in Energy and Environment, University of Castilla-La Mancha, 45071 Toledo, Spain.

Published: August 2021

The special circumstances of the high accident rate in the construction industry compared to other sectors are significant and represent a major concern for many countries. Construction work involves a large number of risks that cause or may cause accidents with serious consequences for the worker's health, even death. The Level of Preventive Action is a novel methodology of occupational risk assessment adapted to building works. It is based on the development of the mathematical formulation of William T. Fine's method. Its implementation covers four of the techniques for combating risk: Safety at Work, Industrial Hygiene, Ergonomics and Psychosociology. It evaluates, quantitatively, the amount of preventive action required based on the characteristic complexity of the work units, their location and their interdependence. The method protocol defines a new observation parameter called Characteristic Value which is inherent to the real situation of the construction process. The aim of this study is to develop the characterisation of the Characteristic Value in the Level of Preventive Action method. It also justifies the procedure to obtain this Characteristic Value and how its implementation and result should be interpreted. Finally, the methodology is applied on a real case.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC8391936PMC
http://dx.doi.org/10.3390/ijerph18168387DOI Listing

Publication Analysis

Top Keywords

preventive action
16
level preventive
12
action method
8
characteristic
5
development level
4
preventive
4
action
4
method
4
method observation
4
observation characteristic
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!