Objective: The study aims to define the set of Key Performance Indicators (KPIs) required to assess the Value delivered by managing patients with Clostridioides difficile infection through a Critical Pathway. We used the quadruple aim Value-Based approach, and we validated the set of KPIs with the Delphi method.

Materials And Methods: The study focuses on patients on board a Critical Pathway on Clostridioides difficile Infection and targeted towards a Fecal Microbiota Transplantation (FMT). FMT has been used to successfully treat recurrent Clostridium difficile infection. A two-round e-Delphi survey collecting data was conducted in 2019-2020 to validate the Value-Based evaluation tool. The Value-Based criteria taken into account are Clinical Outcomes, Experience of Care, Per-capita cost, Physician's burnout.

Results: The two rounds led to the validation of 50 items, and four primary clinical outcomes (Mortality rate, length of stay, readmission and complications related to the illness).

Conclusions: The evaluation tool included is validated in its totality and can provide a comprehensive overview of the Value created by the Critical pathway for patients with Clostridioides difficile. We can extend the approach illustrated in this study can also to evaluate other Critical pathways.

Download full-text PDF

Source
http://dx.doi.org/10.26355/eurrev_202107_26252DOI Listing

Publication Analysis

Top Keywords

critical pathway
16
clostridioides difficile
16
difficile infection
16
patients clostridioides
12
quadruple aim
8
pathway patients
8
evaluation tool
8
clinical outcomes
8
critical
5
difficile
5

Similar Publications

FBXW7 metabolic reprogramming inhibits the development of colon cancer by down-regulating the activity of arginine/mToR pathways.

PLoS One

January 2025

Center of Gene Sequencing, Shanxi Bethune Hospital, Shanxi Academy of Medical Sciences, Tongji Shanxi Hospital, Third Hospital of Shanxi Medical University, Taiyuan, P. R. China.

FBXW7 is a tumor suppressor gene that regulates metabolism and is associated with the onset and progression of colorectal cancer (CRC)), however, the precise mechanism whereby FBXW7 participates in the metabolic reprogramming of CRC remains unclear. Here, the research aims to reveal the association between the expression of FBXW7 and clinical variables and to investigate the molecular mechanism by which FBXW7 plays a critical role in the development of CRC. The clinical importance of FBXW7 in CRC was determined by immunohistochemistry.

View Article and Find Full Text PDF

Hypoxia Combined With Interleukin-17 Regulates Hypoxia-Inducible Factor-1α/Endothelial Nitric Oxide Synthase Expression in Pulmonary Artery Endothelial Cells.

J Cell Mol Med

January 2025

Department of Respiratory and Critical Care Medicine, Beijing Institute of Respiratory Medicine and Beijing Chao-Yang Hospital, Capital Medical University, Beijing, China.

The pathogenesis of chronic thromboembolic pulmonary hypertension may be multifactorial and requires further studies. We explored alterations in pulmonary artery endothelial cells under the hypoxic and elevated interleukin-17 conditions that are commonly present in patients with chronic thromboembolic pulmonary hypertension. We measured the serum interleukin-17 levels in 10 chronic thromboembolic pulmonary hypertension patients and 10 healthy control persons.

View Article and Find Full Text PDF

This study identifies microRNAs (miRNAs) with significant discriminatory power in distinguishing melanoma from nevus, notably hsa-miR-26a and hsa-miR-211, which have exhibited diagnostic potential with accuracy of 81% and 78% respectively. To enhance diagnostic accuracy, we integrated miRNAs into various machine-learning (ML) models. Incorporating miRNAs with AUC scores above 0.

View Article and Find Full Text PDF

Background And Objective: Pectus excavatum is a common congenital chest wall abnormality characterized by a concave appearance of the chest, and minimally invasive repair of pectus excavatum (MIRPE) is the surgical treatment of choice. A rapidly growing field of research is pain management in children undergoing MIRPE, with many shifts in practice occurring over the last decade. The primary objectives of this narrative review are to describe current methods of perioperative pain management and the development of enhanced recovery after surgery (ERAS) to improve the experience of patients undergoing MIRPE.

View Article and Find Full Text PDF

While the role of cancer stem cells (CSCs) in tumorigenesis, chemoresistance, metastasis, and relapse has been extensively studied in solid tumors, such as adenocarcinomas or sarcomas, the same cannot be said for neuroendocrine neoplasms (NENs). While lagging, CSCs have been described in numerous NENs, including gastrointestinal and pancreatic NENs (PanNENs), and they have been found to play critical roles in tumor initiation, progression, and treatment resistance. However, it seems that there is still skepticism regarding the role of CSCs in NENs, even in light of studies that support the CSC model in these tumors and the therapeutic benefits of targeting them.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!