A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Modelling of integrated scheduling problem of capacitated equipment systems with a multi-lane road network. | LitMetric

The coordination of different container-handling equipment is an important method for improving the overall efficiency of automated container terminals. In the real terminal, we should consider many real-life issues, such as the equipment capacity, the equipment collision, changing lanes in the multi-lane road, and choosing one of container-handling lanes for each container. This paper proposes the integrated scheduling problem of three container-handling equipment with the capacity constraint and the dual-cycle strategy, for simultaneously solving the equipment scheduling problem, the assignment problem of the container-handling lane and the conflict-free route planning problem of automated guided vehicles (AGVs). With the objective of minimizing the ship's berth time, we propose a mixed-integer programming model based on the space-time network representation method and two bilevel optimization algorithms based on conflict resolution rules. Finally, numerical experiments are conducted to verify the effectiveness of the proposed model and two bilevel optimization algorithms.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC8171962PMC
http://journals.plos.org/plosone/article?id=10.1371/journal.pone.0251875PLOS

Publication Analysis

Top Keywords

scheduling problem
12
integrated scheduling
8
multi-lane road
8
container-handling equipment
8
equipment capacity
8
bilevel optimization
8
optimization algorithms
8
equipment
6
problem
5
modelling integrated
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!