A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase. | LitMetric

Healthcare organizations strive to deliver safe, high-quality, efficient care. These complex systems frequently harbor gaps, which if unmitigated, could result in harm. Systems-focused simulation (SFS) projects, which include systems-focused debriefing (SFD), if well designed and executed, can proactively and comprehensively identify gaps and test and improve systems, enabling institutions to improve safety and quality before patients and staff are placed at risk.The previously published systems-focused debriefing framework, Promoting Excellence and Reflective Learning in Simulation (PEARLS) for Systems Integration (PSI), describes a systematic approach to SFD. It includes an essential "pre-work" phase, encompassing evidence-informed steps that lead up to a SFD. Despite inclusion in the PSI framework, a detailed description of the pre-work phase, and how each component facilitates change management, was limited.The goal of this paper is to elucidate the PSI "Pre-work" phase, everything leading up to the systems-focused simulation and debriefing. It describes how the integration of project and change management principles ensures that a comprehensive collection of safety and quality issues are reliably identified and captured.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC8082890PMC
http://dx.doi.org/10.1186/s41077-021-00169-xDOI Listing

Publication Analysis

Top Keywords

pre-work phase
8
systems-focused simulation
8
systems-focused debriefing
8
safety quality
8
"pre-work" phase
8
change management
8
systems-focused
5
building impactful
4
impactful systems-focused
4
systems-focused simulations
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!