Purpose: The purpose of this retrospective study is to evaluate the association of total therapy time during inpatient rehabilitation and gain in functional independence for patients admitted to an inpatient rehabilitation facility (IRF).

Materials And Methods: The study utilized a retrospective design that included all IRF patients from three IRFs in California from January 1, 2012 to December 31, 2013. Patient data collected as part of usual, routine medical, and rehabilitation care were used and includes demographics, medical variables, and functional outcomes data.

Results: There were 3212 patients discharged from the three IRFs, with 2,777 patients having received speech language pathology (SLP) therapy along with occupational therapy and physical therapy. Speech language pathology services were not provided for 435 patients in the database. Our results support that among all types of patients, increased therapy hours were associated with increased functional gains. For total functional independence measure (FIM) gain, an additional hour of PT therapy per day was associated with an increase of 7.55 FIM gain points ( < 0.001) and an additional hour of OT therapy per day was associated with an increase of 1.16 FIM gain points ( = 0.045), when adjusted for other variables in the model. SLP hours per day did not remain in the FIM gain model.

Conclusions: The findings of this study add to the understanding of therapy time and functional gain in an inpatient rehabilitation program. There is a positive relationship between total therapy time and functional gain. In the future determining the intensity and the related therapy activities provided will be needed to impact functional change. This has implications for shaping rehabilitation practice in the future.Implications for rehabilitationIncreased number of therapy hours were associated with functional gains in an inpatient rehabilitation program for all types of patients.An additional hour of physical therapy per day was associated with an increase of 7.55 functional independence measure (FIM) point gain.An additional hour of occupational therapy per day was associated with an increase of 1.16 FIM point gain.Determining the intensity and related activities are needed to impact functional change which has implications for shaping rehabilitation practice.

Download full-text PDF

Source
http://dx.doi.org/10.1080/09638288.2021.1912836DOI Listing

Publication Analysis

Top Keywords

inpatient rehabilitation
12
retrospective study
8
therapy time
8
functional gains
8
functional independence
8
three irfs
8
speech language
8
language pathology
8
fim gain
8
therapy
7

Similar Publications

Importance: No single cognitive screen adequately captures the cognitive domains needed for inpatient occupational therapy treatment planning.

Objective: To assess the construct validity of the Gaylord Occupational Therapy Cognitive (GOT-Cog©) screen, a novel comprehensive cognitive screen that evaluates functional cognition.

Design: Randomized crossover controlled study design using the St.

View Article and Find Full Text PDF

Background: With substantial resources allocated to develop virtual reality (VR)-based rehabilitation exercise programs for poststroke motor rehabilitation, it is important to understand how patients with stroke perceive these technology-driven approaches, as their perceptions can determine acceptance and adherence.

Objective: This study aimed to examine the perceptions of patients with stroke regarding an immersive VR-based exercise system developed to deliver shoulder, elbow, forearm, wrist, and reaching exercises.

Methods: A questionnaire was used to assess the perceptions of 21 inpatients who had experienced stroke (mean time from stroke onset: 37.

View Article and Find Full Text PDF

Optimizing length of hospital stay among inpatients with spinal cord injury: An observational study.

J Healthc Qual Res

December 2024

Department of Research and Innovation, Institut Guttmann, Institut Universitari de Neurorehabilitació adscrit a la UAB, Badalona, Barcelona, Spain; Universitat Autònoma de Barcelona, Bellaterra (Cerdanyola del Vallès), Spain; Fundació Institut d'Investigació en Ciències de la Salut Germans Trias i Pujol, Badalona, Barcelona, Spain.

Introduction And Objectives: Despite the importance of length of stay (LOS) following spinal cord injury, it remains underexplored in the literature. This study aims to bridge this gap by investigating the association between rehabilitation LOS and functional gains among patients with traumatic (TSCI) or non-traumatic (NTSCI) spinal cord injuries.

Methods: We conducted a retrospective observational cohort study assessing functional gains using the motor Functional Independence Measure (mFIM) and the Spinal Cord Independence Measure (SCIM III) from rehabilitation admission to discharge.

View Article and Find Full Text PDF

Aims: The Clavien-Dindo (CD) classification and Comprehensive Complication Index (CCI) have been validated primarily among general surgical procedures. To date, the validity of these measures has not been assessed in patients undergoing arthroplasty.

Methods: This retrospective cohort study included patients undergoing primary total hip and knee arthroplasty between April 2013 and December 2019.

View Article and Find Full Text PDF

Background: Traumatic cervical spinal cord injury (cSCI) is a serious condition that requires a multidisciplinary treatment approach involving care at a neurotrauma center (NTC) and specialized rehabilitation. Contemporary population-based studies of cSCI are important for ensuring the quality and planning of health care approaches for these patients.

Methods: This is a population-based cohort study of patients with traumatic cSCI who were admitted to the NTC in Southeast Norway between 2015 and 2022.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!