Severity: Warning
Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 143
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 143
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 209
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3098
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 574
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 488
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Severity: Warning
Message: Attempt to read property "Count" on bool
Filename: helpers/my_audit_helper.php
Line Number: 3100
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3100
Function: _error_handler
File: /var/www/html/application/controllers/Detail.php
Line: 574
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 488
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The growing burden of valvular heart disease in Western countries represents a challenge for the daily clinical practice, especially in the light of the ever-increasing number of therapeutic options. The Euro Heart Survey showed that, among elderly subjects with severe, symptomatic valve dysfunction, surgery is denied for 33% of patients with aortic stenosis and for 50% of patients with mitral regurgitation. Current management (from diagnosis to follow-up) is often fragmented in multiple-sometimes unnecessary-steps. Such a "patchy" approach may translate into a suboptimal management, especially in the geriatric population. New healthcare models exist that can coordinate care, reduce fragmentation, limit costs and, ultimately, improve outcomes: the clinical pathways.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1097/HPC.0000000000000260 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!