COVID-19 pandemic has been spread like wildfire and left its deadly impact throughout the world. This would harm businesses according to the sectors. Like other sectors real estate sector under the construction industry is also facing the impact of the COVID-19 pandemic. It becomes very detrimental about labour market, company liquidity, the supply of materials, project delivery, and key cost components, and so on. In general, it happens that the real estate sector often experiences complexities in case of project completion, scheduling, and financing. The planned work cannot be carried out due to the non-availability of sufficient numbers of skilled labours and staff. Moreover due to effects of pandemic real estate sectors and the work-life of real estate professionals are being hampered. It is very much obvious that human resources act as the lifeline of any organization and they need to be handled and managed with the utmost care and dignity. Despite the physical, technological and financial resources in the business, human resource is such a critical asset that employers should take care of their quality of work-life all the time, not only during the crisis period. By satisfying them the business can achieve its objectives in terms of revenue and recognition. After a strict lockdown when things return to new normal and employees return to work, the company needs to take certain 'human resource' perspectives for maintaining a good quality of work life. All the employers should implement some strategies concerning to qualitative work life of the employees during this epidemic situation. The real estate sector is labour intensive and employees are a very critical resource that helps to increase productivity and enhancing competitiveness in the market. The impact of the pandemic on the quality of work-life among real estate employees in Kolkata, India is also studied.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC7987551 | PMC |
http://dx.doi.org/10.1007/s11135-021-01136-4 | DOI Listing |
Crit Care Med
January 2025
Mass General Brigham (MGB) Health Design Lab, Boston, MA.
Objectives: The ICU built environment-including the presence of windows-has long been thought to play a role in delirium. This study investigated the association between the presence or absence of windows in patient rooms and ICU delirium.
Design: Retrospective single institution cohort study.
Water Res
December 2024
School of Environment, Tsinghua University, 100084, Beijing, PR China.
BMC Public Health
January 2025
Department of Health Policy and Management, Fielding School of Public Health at UCLA, Box 951772, Los Angeles, CA, 90095-1772, USA.
Background: Shared equity homeownership - a model in which low- and moderate-income households purchase homes at affordable prices on the condition that the houses remain affordable upon resale - has been shown to produce several health-enhancing housing outcomes. These include permanent affordability, housing stability, and modest wealth-building. However, studies suggest low- and moderate-income households may sacrifice neighborhood quality when becoming homeowners, which can undermine the health benefits of homeownership.
View Article and Find Full Text PDFBioact Mater
April 2025
Department of Mechanical Engineering, The University of Hong Kong, Pokfulam Road, Hong Kong, China.
Human long bones exhibit pore size gradients with small pores in the exterior cortical bone and large pores in the interior cancellous bone. However, most current bone tissue engineering (BTE) scaffolds only have homogeneous porous structures that do not resemble the graded architectures of natural bones. Pore-size graded (PSG) scaffolds are attractive for BTE since they can provide biomimicking porous structures that may lead to enhanced bone tissue regeneration.
View Article and Find Full Text PDFSci Rep
December 2024
Chongqing Jianzhu College, Chongqing, 400072, China.
Prefabricated construction involves manufacturing components in a factory and then transporting them to a construction site for assembly, yielding resource savings and improved efficiency. However, the large size and weight of prefabricated components, along with strict delivery requirements, introduce logistical challenges, such as increased carbon emissions during transport and site congestion. This study addresses the dual-objective vehicle scheduling problem for prefabricated components.
View Article and Find Full Text PDFEnter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!