A permit to work (PTW) system is a formal procedure designed to control non-routine and hazardous works. However, this system by itself does not prevent incidents, and various factors contribute to its efficiency. This study aims to prioritize the indicators influencing system efficiency. To do this, indicators of the system were identified and scored by 15 safety experts. Next, priority weights of the indicators were analyzed by an analytic network process and Super Decisions version windows 2.10. Accordingly, the nine main indicators and 43 sub-indicators influencing the PTW system were ranked. The main indicators from high to low were preventive actions, training, safe procedures, emergency system, control and corrective measures, coordination, monitoring, details of the permit form and documentation, respectively. The present work helps identify the involved indicators in PTW system efficiency. Thereby, the experts can prioritize and perform measures to prevent failures in the system and decrease accidents.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1080/10803548.2020.1862516 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!