A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Development and adoption of wastewater treatment system for peri-urban agriculture in Multan, Pakistan. | LitMetric

The present research was conducted to assess the feasibility of biological treatment of a typical wastewater (WW) stream in Multan, Pakistan, using daily trends of WW characteristics and to design a wastewater treatment (WWT) system for that stream. The pH (5.8-6.2), temperature (24-30 °C), biological oxygen demand (BOD: 128-265 mg/L), ultimate BOD (BOD: 227-438 mg/L), BOD/total Kjeldahl nitrogen (BOD/TKN:5.9-11.2), BOD/BOD (1.6-2.0), carbonaceous BOD/nitrogenous BOD (CBOD/NBOD:1.6-2.8) of the WW was found to support the biological WWT. The inclusion of NBOD also indicated the need for nitrification-denitrification. The linear regression analysis of volatile suspended solids (VSS) with total suspended solids (TSS) indicated the high content of organic solids, which also made the WW suitable for biological treatment. The BOD/COD (chemical oxygen demand) <0.8 indicated the requirement for biomass acclimation. The major process units of the WWT system developed included a primary clarifier, cascade aeration, trickling filter, adsorption filter and chlorination contact tank. During the validation of design procedures, considerable removal of TSS (91%), TDS (46%), BOD (88%), COD (87%) was observed over the 15 week operational period of the secondary WWT system. The WWT system developed was appropriate as a sustainable WWT system that consumed less energy and had lower operational costs.

Download full-text PDF

Source
http://dx.doi.org/10.2166/wst.2019.403DOI Listing

Publication Analysis

Top Keywords

wastewater treatment
8
multan pakistan
8
biological treatment
8
oxygen demand
8
suspended solids
8
development adoption
4
adoption wastewater
4
treatment
4
treatment system
4
system peri-urban
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!