Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
The aim of this paper is to analyze the reality of risk prevention in construction sector companies in Spain, from the perspective of training, management, and risk prevention, as well as the amount of resources that are allocated to those budget headings. An in-depth comparative review has been conducted, using the data obtained from two focus groups that were expressly created for the study, in conjunction with the Second European Survey of Enterprises on New and Emergent Risks (ESENER-2) and its Spanish counterpart (ESENER-2 Spain). The focus groups were formed with agents and entrepreneurs involved in the construction sector, from both the public and the private sector, in order to provide greater impartiality to the resulting data. The principal strategic indicators that served as a guideline for the moderators of the different focus groups were analyzed. The results obtained show great similarity between the data from the focus groups and the data from ESENER-2 and ESENER-2 Spain; which demonstrates the idiosyncrasies that surround this productive sector in the European setting, so badly treated by the economic crisis. All of these points highlight the imperative need to professionalize the construction sector, implementing a "" among all of the agents involved in the constructive-preventive processes that surround construction activities.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC6604018 | PMC |
http://dx.doi.org/10.3390/ijerph16112045 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!