Optimal care for children and adolescents with type 1 diabetes is well described in guidelines, such as those of the International Society for Pediatric and Adolescent Diabetes. High-income countries can usually provide this, but the cost of this care is generally prohibitive for lower-income countries. Indeed, in most of these countries, very little care is provided by government health systems, resulting in high mortality, and high complications rates in those who do survive. As lower-income countries work toward establishing guidelines-based care, it is helpful to describe the levels of care that are potentially affordable, cost-effective, and result in substantially improved clinical outcomes. We have developed a levels of care concept with three tiers: "minimal care," "intermediate care," and "comprehensive (guidelines-based) care." Each tier contains levels, which describe insulin and blood glucose monitoring regimens, requirements for hemoglobin A1c (HbA1c) testing, complications screening, diabetes education, and multidisciplinary care. The literature provides various examples at each tier, including from countries where the life for a child and the changing diabetes in children programs have assisted local diabetes centres to introduce intermediate care. Intra-clinic mean HbA1c levels range from 12.0% to 14.0% (108-130 mmol/mol) for the most basic level of minimal care, 8.0% to 9.5% (64-80 mmol/mol) for intermediate care, and 6.9% to 8.5% (52-69 mmol/mol) for comprehensive care. Countries with sufficient resources should provide comprehensive care, working to ensure that it is accessible by all in need, and that resulting HbA1c levels correspond with international recommendations. All other countries should provide Intermediate care, while working toward the provision of comprehensive care.

Download full-text PDF

Source
http://dx.doi.org/10.1111/pedi.12801DOI Listing

Publication Analysis

Top Keywords

care
15
intermediate care
12
comprehensive care
12
type diabetes
8
care children
8
children adolescents
8
countries
8
countries provide
8
lower-income countries
8
levels care
8

Similar Publications

The aim of this research is to analyse the impact of surface cleaner type and hydrodynamic flow on bacterial detachment. For that purpose, a new liquid flow chamber was constructed and applied. In experiments, was grown on linoleum surfaces that are used in health care institutions.

View Article and Find Full Text PDF

Background: Chronic Obstructive Pulmonary Disease (COPD) is a heterogeneous condition with different risk factors, including family history. This study aimed to explore association between a family history of chronic airway disease and features and outcomes of COPD.

Methods: Participants were obtained from the RealDTC study between December 2016 and December 2022.

View Article and Find Full Text PDF

Background: Predictive equations often inaccurately estimate energy needs in critically ill patients. This study evaluated the level of agreement between resting energy expenditure using 12 and 25 kcal/kg as recommended by the 2021 American Society for Parenteral and Enteral Nutrition critical care guidelines for nutrition support and energy expenditure measured by indirect calorimetry in patients in the intensive care unit.

Methods: An agreement study was conducted on mechanically ventilated adults who had a documented measured energy expenditure within 10 days of intensive care unit admission.

View Article and Find Full Text PDF

Objective: The objective of this study was to evaluate associations of early-pregnancy plasma per- and polyfluoroalkyl substances (PFAS) with maternal post-pregnancy weight trajectory parameters.

Methods: We studied 1106 Project Viva participants with measures of early-pregnancy plasma concentrations of eight PFAS. We measured weight at in-person visits at 6 months and 3, 7, and 12 years after pregnancy and collected self-reported weight via annual questionnaires up to 17 years after pregnancy.

View Article and Find Full Text PDF

Study DesignNarrative Review.ObjectivesTo summarize the work of the AO Spine Knowledge Forum Tumor, specifically studies from the Epidemiology, Process and Outcomes in Spine Oncology (EPOSO) study.MethodsA narrative review of all published manuscripts from the EPOSO study was undertaken.

View Article and Find Full Text PDF

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!