Severity: Warning
Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests
Filename: helpers/my_audit_helper.php
Line Number: 176
Backtrace:
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url
File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML
File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global
File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword
File: /var/www/html/index.php
Line: 316
Function: require_once
Modern bioenergy is being recognized as an increasingly important low-carbon resource by policy-makers around the world to meet climate policy targets. In India also, there is a clear recognition of the significant role of bioenergy in electricity generation as well as in other applications. In this study, a preliminary attempt has been made to assess the techno-economic feasibility of biomass pellets-based power (BPBP) generation in India. Surplus availability of biomass feedstock from agriculture and forestry/wasteland sector is estimated at 242 million tonnes (Mt) for 2010-11 and is expected to rise to 281 Mt in 2030-31 due to increased crop production and associated waste/residue availability. In terms of related capacity, the potential of BPBP projects is estimated at 35 GW for 2030-31. The associated carbon dioxide mitigation potential resulting from the substitution of coal is estimated at 205 Mt in 2030-31 if the entire biomass surplus is to be diverted for power generation. The levelized cost of electricity is estimated at €0.12 per kWh for BPBP projects as compared to €0.10 per kWh for imported coal based power plants. For states with the lower tariff for biomass power, the break-even price of carbon for BPBP projects is estimated at €18 per tonne. Additionally, BPBP projects will generate employment of more than 5 million person-months in the construction of biomass power plants and over 200,000 full-time employments in the operation of BPBP plants and in the production of biomass pellets.
Download full-text PDF |
Source |
---|---|
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC6153682 | PMC |
http://dx.doi.org/10.1007/s11356-018-2960-8 | DOI Listing |
Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!