A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

An assessment of critical care capacity in the Gambia. | LitMetric

Purpose: Critical illnesses are a major cause of morbidity and mortality in The Gambia, yet national data on critical care capacity is lacking.

Materials And Methods: We surveyed eight of the eleven government-owned health facilities providing secondary and tertiary care in The Gambia's public health sector. At each hospital, a designated respondent completed a questionnaire reporting information on the presence of an intensive care unit, the number of critical care beds where available, monitoring equipment, and the ability to provide basic critical care services at their respective hospitals.

Results: The response rate was 88% (7/8 hospitals). Only one hospital had a dedicated intensive care unit with eight ICU beds, resulting in an estimated 0.4 ICU beds/100,000 population in the country. All hospitals reported treating more than 50 critically ill patients a month, with trauma, obstetric emergencies, hypertensive emergencies and stroke accounting for the leading causes of admission respectively. The country lacks any trained specialists and resources to diagnose and treat critically ill patients.

Conclusions: The Gambia has a very low ICU bed capacity and lacks the human resources and equipment necessary to diagnose and treat the large number of critically ill patients admitted to public hospitals in the country.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.jcrc.2018.07.022DOI Listing

Publication Analysis

Top Keywords

critical care
16
critically ill
12
care capacity
8
intensive care
8
care unit
8
ill patients
8
diagnose treat
8
care
7
assessment critical
4
capacity gambia
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!