A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Decision making guidelines for mining historic landfill sites in Flanders. | LitMetric

Decision making guidelines for mining historic landfill sites in Flanders.

Waste Manag

Christian Doppler Laboratory for Anthropogenic Resources, Institute for Water Quality and Resource Management, Technische Universität Wien, Karlsplatz 13/226, 1040 Vienna, Austria.

Published: July 2018

This study aims at showing how the United Nations Framework Classification for Resources (UNFC) can help to classify potential landfill mining projects with different levels of maturity, from exploration to production, under technical, socio-economic and project-planning aspects. Taking the example of three former landfill sites in Flanders general decision making guidelines regarding the future management of old landfills are provided. Using the ECLAR methodology for the evaluation (E) and classification (CL) of anthropogenic resources (AR), the individual projects, where clean land and/or materials are recovered, are mapped under the three-dimensional UNFC system. The Bornem project, yields a negative Net Present Value (NPV) of -17 Mio € (-44 €/t of excavated waste), i.e. the project is currently not economically viable. In case of changing key parameters the landfill has, however, reasonable prospects for future economic extraction. The Turnhout land development turned out to be economically viable with a NPV of 361,000 € (8 €/t of excavated waste). The Zuienkerke remediation project is at a too early stage to determine its socioeconomic viability. The main focus to compare and prioritize potential landfill mining projects in Flanders should be on (1) site specific conditions (e.g. landfill's composition, land prices), (2) project related factors (e.g. remediation required vs. resource/land recovery, selected technologies and project set-ups, private vs. public evaluation perspective) and (3) the timing of mining, considering future development of costs, prices, laws, available data and information.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.wasman.2018.03.049DOI Listing

Publication Analysis

Top Keywords

decision making
8
making guidelines
8
landfill sites
8
sites flanders
8
potential landfill
8
landfill mining
8
mining projects
8
excavated waste
8
economically viable
8
landfill
5

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!