A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3122
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Influence of clogging and resting processes on flow patterns in vertical flow constructed wetlands. | LitMetric

Influence of clogging and resting processes on flow patterns in vertical flow constructed wetlands.

Sci Total Environ

College of Water Conservancy and Hydroelectric Power, Hohai University, Nanjing 210098, PR China.

Published: April 2018

Vertical flow constructed wetlands are widely used for removing pollutants from wastewater. Substrate clogging is an operational challenge of constructed wetlands, which can result in impeded water flow and finally a significant decline in the ability of the system to treat the wastewater. The entire clogging process in a vertical flow constructed wetland (VFCW) was quantitatively analyzed by measurements of hydraulic conductivity. Tracer tests and model simulations were carried out to investigate internal flow patterns during the clogging and resting processes. This analysis revealed that hydraulic conductivity gradually decreased with operation time. Further, the distribution time of the flow field was different under different degrees of clogging. Non-uniformity in water flow was primarily observed in the first 400min after adding the tracer (NaCl) in the early clogging stage, as opposed to the last 400min in the late clogging stage. Variation in water flow divergence was closely correlated with piston flow; the reaction efficiency was highest in the early stages of clogging. In the later stages, stronger flow mixing was observed. Resting operations can reduce the dispersion of internal flow and improve reaction efficiency. After resting for approximately 15days, tracer concentration fluctuations decreased and internal flow back-mixing was alleviated. A simulation further described the internal flow pattern and elaborated and validated the tracer experiment. The outcomes of this study will assist in understanding how internal flow behavior varies in response to the clogging process and reveal details of the internal clogging mechanism in VFCWs.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.scitotenv.2017.10.113DOI Listing

Publication Analysis

Top Keywords

internal flow
20
flow
15
vertical flow
12
flow constructed
12
constructed wetlands
12
water flow
12
clogging
9
clogging resting
8
resting processes
8
flow patterns
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!