A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@pubfacts.com&api_key=b8daa3ad693db53b1410957c26c9a51b4908&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 176

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 176
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 250
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1034
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3152
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 575
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 489
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 316
Function: require_once

Provision of an emergency theatre in tertiary hospitals is cost-effective: Audit and cost of cancelled planned elective general surgical operations at Pietersburg Hospital, Limpopo Province, South Africa. | LitMetric

Background: Cancellations of planned elective surgical operations increase financial cost to the patient and the hospital.

Objectives: To determine the rate and reasons for cancellations, estimate the cost incurred by such cancellations and recommend possible solutions.

Methods: We did a prospective descriptive study of cancellations of elective general surgical operations over the 1-year period January - December 2014 in the main theatre at Pietersburg (PTB) Hospital, Limpopo Province, South Africa. All patients listed on the theatre booking slate for elective general surgical operations before the cut-off time of 13h00 on the day before the anticipated operation were included. Epi Infoversion 7 was used to analyse the data and derive the descriptive statistics.

Results: There were 537 booked patients (median age 47 years, range 1 - 94); a total of 298 operations were performed, and 239 were cancelled (cancellation rate 44.5%). Reasons for cancellation were as follows: theatre needed for an emergency n=154 (64.4%), theatre equipment failure and lack of consumables n=17 (7.1%), non-theatre equipment failure n=10 (4.2%), prolonged time of operations n=13 (5.4%), abnormal blood results n=8 (3.3%), patient comorbidity and poor general condition n=9 (3.8%), patients absent from the ward n=8 (3.3%), patients not starved n=2 (0.8%), patients' condition improved significantly n=3 (1.3%), nurses' strike n=5 (2.1%), rebooking of cases for senior surgeons or other specialty n=2 (0.8%), and other reasons n=8 (3.3%). The cost per inpatient per day was estimated at ZAR4 890 at PTB Hospital and ZAR2 100 at district hospitals, and the total cost per cancelled operation was ZAR25 860.

Conclusions: Over the 1-year period 44.5% of elective operations at PTB Hospital were cancelled, 64.4% because the theatre was needed for an emergency operation. We recommend that a theatre dedicated to emergencies be opened at PTB Hospital. The cost incurred due to cancellations was about ZAR6 million for the hospital, with additional cost and emotional trauma for the patients.

Download full-text PDF

Source
http://dx.doi.org/10.7196/SAMJ.2017.v107i3.10687DOI Listing

Publication Analysis

Top Keywords

surgical operations
16
ptb hospital
16
elective general
12
general surgical
12
n=8 33%
12
cost cancelled
8
planned elective
8
hospital limpopo
8
limpopo province
8
province south
8

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!