Experimental dataset for optimising the freight rail operations.

Data Brief

School of Transportation and Logistics, Southwest Jiaotong University, Chengdu City 6117563, Sichuan Province, China.

Published: December 2016

The freight rail systems have an essential role to play in transporting the commodities between the delivery and collection points at different locations such as farms, factories and mills. The fright transport system uses a daily schedule of train runs to meet the needs of both the harvesters and the mills (An Integrated Approach to Optimise Cane Rail Operations (M. Masoud, E. Kozan, G. Kent, Liu, Shi Qiang, 2016b) [1]). Producing an efficient daily schedule to optimise the rail operations requires integration of the main elements of harvesting, transporting and milling in the value chain of the Australian agriculture industry. The data utilised in this research involve four main tables: sidings, harvesters, sectional rail network and trains. The utilised data were collected from Australian sugar mills as a real application. Operations Research techniques such as metaheuristic and constraint programming are used to produce the optimised solutions in an analytical way.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC5053071PMC
http://dx.doi.org/10.1016/j.dib.2016.09.015DOI Listing

Publication Analysis

Top Keywords

rail operations
12
freight rail
8
daily schedule
8
rail
5
experimental dataset
4
dataset optimising
4
optimising freight
4
operations
4
operations freight
4
rail systems
4

Similar Publications

Want AI Summaries of new PubMed Abstracts delivered to your In-box?

Enter search terms and have AI summaries delivered each week - change queries or unsubscribe any time!